Skip to content

DERC · Delhi Electricity Regulatory Commission

Delhi Electricity Supply Code and Performance Standards, 2007 — Third Amendment, 2016

Delhi Electricity Supply Code and Performance Standards (Third Amendment) Regulations, 2016

AmendmentDated 1 Apr 2016F.17(85)/Engg./DERC/15-16/Part File-2/5178/ dated 1st April, 2016

Replaced by Delhi Supply Code and Performance Standards Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Delhi Electricity Supply Code and Performance Standards Regulations, 2007.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or action taken or purported to have been taken, or proceedings initiated under such repealed Regulations, shall be deemed to have been taken under these Regulations to the extent that same were not inconsistent with the Act.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A four-page DERC notification that amends the Delhi Electricity Supply Code and Performance Standards Regulations, 2007 by inserting a new Regulation 23A requiring the distribution licensee to review every consumer's sanctioned load or contract demand against actual metered demand (p1). It is the third amendment to the principal 2007 Regulations and takes effect from Gazette publication, which is not dated in the text; the notification is itself dated 1 April 2016 (p1, p4).

The new regulation sets out a self-contained annual load-review cycle. The revised load is computed from the highest of the averages of Maximum Demand readings over any four consecutive calendar months of the previous financial year (1 April–31 March), rounded down to the lower integer, with a minimum sanctioned load floor (p1). Where the computed figure exceeds the existing load, the licensee must issue a separate notice giving the exact readings relied on, the enhanced security deposit and any differential service line cum development (SLD) charges, with 30 days to pay; unpaid amounts may then be added to the next bill (p2).

The regulation applies the upward revision to all consumer categories (p3). For domestic consumers a computed lower load triggers a consent-based reduction, with automatic reduction only for those at or below a small sanctioned-load threshold, and pro-rata refund of security deposit (with interest) through energy bills (p3). SLD charges are non-refundable on load reduction or termination (p3). Notices must be issued by 31 May, no upward revision notice may issue after that, the licensee pays compensation if a downward-revision notice is missed, and revision is allowed once a financial year with effect from 1 July (p3–4). A six-month bar follows any enhancement before a consumer may seek reduction (p4).

The closing Notes state that four earlier DERC directions on the same subject are superseded but that cases already dealt with under them will not be reopened (p4). The page 1–3 illustrations are worked arithmetic examples of rounding, differential SLD charging and pro-rata refunds.

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
New connections and load changes, Conditions of supply, Standards of performance

Read with this

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document