Skip to content

DERC · Delhi Electricity Regulatory Commission

Delhi Electricity Supply Code and Performance Standards Regulations, 2007

CodeDated 18 Apr 2007No. F. 17(85)/Engg./DERC/2005-06/209/F.No. (115)/2006/Power/985. dated 18th April, 2007

Replaced by Delhi Supply Code and Performance Standards Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or action taken or purported to have been taken, or proceedings initiated under such repealed Regulations, shall be deemed to have been taken under these Regulations to the extent that same were not inconsistent with the Act.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software, from pages 1 to 43 of 128. Check the regulator's original before you rely on it.

This is the Delhi Electricity Regulatory Commission's 2007 Supply Code and Performance Standards Regulations, made under section 50 read with sections 57, 86 and 181 of the Electricity Act 2003 (p1, p9). They apply to all distribution and retail supply licensees, including deemed licensees, and to all consumers in the National Capital Territory of Delhi; they also cover unauthorised supply, unauthorised use, diversion and similar abstraction of electricity (p9). They come into force on publication in the official Gazette, but the Gazette date is not printed; the notification is dated 18 April 2007 (p1, p9).

Chapter I (pp9–15) gives the short title, commencement and scope, then a long definitions clause. The definitions cover regulators and statutory officers, technical supply terms such as HT, LT, EHT, connected load, contract demand, maximum demand, billing demand and sanctioned load, and commercial concepts such as agreement, energy charges, demand charges, fixed charges and Tariff Order.

Chapter II (pp16–21) specifies the system of supply — declared frequency and voltage, permissible voltage variation, and the licensee's design/operation responsibility — and classifies consumers into categories such as Domestic, Non-Domestic Low Tension, Mixed Load High Tension, Small Industrial Power, Large Industrial Power, Agriculture, Mushroom Cultivation, Street Lighting, Signals and Blinkers, Railway Traction and Delhi Metro Rail Corporation. Each category is defined by load band and the voltage/phase of supply to be provided.

Chapter III (pp22–32) sets procedures for new and existing connections. It covers display of application procedures and document lists, no-dues verification, processing timelines for electrified areas, connection where system augmentation is needed, unelectrified areas, temporary supply, transfer of connection, transfer to legal heir, load reduction, change of category, load enhancement and phase/voltage conversion. It repeatedly links licensee delay to compensation under Schedule III.

Chapter IV (pp33–38) covers execution and termination of agreements, registration-cum-processing fees, security deposit, service line cum development charges, installation inspection fees, substation space for HT/EHT supply, and additional charges such as meter testing and special meter reading fees.

Chapter V (pp39–43, partial) begins metering and billing. It specifies meter installation, sealing and custody, consumer wiring obligations, meter reading, meter testing, meter accuracy adjustment/refund/recovery, and meter-not-recording procedure.

Later parts, per the contents, include Chapter VI Disconnection and Reconnection, Chapter VII Theft and Unauthorised Use of Electricity, Chapter VIII Complaint Handling Procedure, Chapter IX Guaranteed and Overall Standards of Performance, Chapter X Miscellaneous, Schedule I Guaranteed Standards, Schedule II Overall Standards, Schedule III Guaranteed Standards and Compensation, and Annexes I–XIII containing application, inspection, meter-testing, self-assessment and disconnection formats (pp4–8.

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Conditions of supply, Standards of performance, New connections and load changes

Read with this

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document