Skip to content

DERC · Delhi Electricity Regulatory Commission

Delhi Electricity Supply Code and Performance Standards Regulations, 2007 — Fourth Amendment, 2016

Delhi Electricity Supply Code and Performance Standards (Fourth Amendment) Regulations, 2016

AmendmentDate not statedF.17 (85)/Engg./DERC/2013-14/4074

Replaced by Delhi Supply Code and Performance Standards Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Delhi Electricity Supply Code and Performance Standards Regulations, 2007.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or action taken or purported to have been taken, or proceedings initiated under such repealed Regulations, shall be deemed to have been taken under these Regulations to the extent that same were not inconsistent with the Act.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is DERC's fourth amendment to the Delhi Electricity Supply Code and Performance Standards Regulations, 2007, issued under s.50 read with ss.57, 86 and 181 of the Electricity Act 2003 and following directions from the Government of NCT of Delhi under s.108 (p1). It takes effect immediately; no Gazette date is printed (p1).

Regulation 2 rewrites Regulation 63(vi) of the principal regulations — the procedure for lodging complaints — so that all complaints are monitored by the Centralized Complaint Receiving Centre for resolution within the stipulated time, scheduled outages are published in a manner the Commission may specify, and licensees report unscheduled outages to the Ombudsman, with a daily summary and individual-outage details including any compensation (p1).

Regulation 3 replaces the text of Regulation 69 (Exemption), setting out two grounds on which performance standards are suspended or breach is excused: force majeure conditions affecting the licensee's installations, and failures caused by the STU/CTU, grid failure, transmission-network faults, SLDC instructions or other matters beyond the distribution licensee's reasonable control (p1–2).

Regulation 4 substitutes clause 1 of Schedule-I, the guaranteed standards on restoration of power supply, tying maximum restoration times to the nature of the failure — HT mains, grid substation problems, transformer failure, burnt meters, street-light faults, scheduled outages and roster load shedding — and adds an explanation defining Scheduled Power Outages (p2–3).

Regulation 5 reworks Schedule-III on guaranteed standards and compensation: it substitutes article 6 (power supply failure) with a service-area/standard versus compensation table, adds a note fixing a simpler rule where up to 100 consumers are affected, and appends clauses 4(i)–(vi) to the manner-of-payment provisions, covering adjustment through bills, how the default period is reckoned, escalation to the Ombudsman, enhanced compensation where the Ombudsman upholds a claim, recourse to the Commission under s.142, and disallowance of compensation in the licensee's ARR (p3–6).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Standards of performance, Consumer grievance redressal (CGRF), Electricity ombudsman

Read with this

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document