Renewable Power Purchase Obligation Regulation, 2022 — Statement of Reasons
- 2.6 Commission's proposal of clause 2(1)(u) in Draft … › combined)… "Provided further that the obligation to purchase electricity from generation based on hydro as a renewable energy source can be fulfilled through hydro energy or energy through Pumped Storage Projects of hydro certificates only: …
- 2.1 Commission's proposal of clause 2(1)(f) in Draft … › Commission's view… uncertainty in the availability of adequate resources for fulfilling the obligation. As such, the Commission is of the view that no modification is required for incorporating the Hydro Energy Certificate (HEC) in the definition of …
3 matching passages in this document
Framework for Resource Adequacy Regulation, 2026
- CHAPTER 4- GENERATION RESOURCE PLANNING › 9. Preparation of Generation Resource Planning… j) Renewable Purchase Obligation (RPO) including Energy Storage Obligation targets, etc.; k) Constraints such as penalties for unmet demand, forced outages, and system emission limits as defined in State Grid Code and Indian Electricity …
- Methodology for Preparation of Resource Adequacy Plan with …Fulfilment of Renewable Purchase Obligation shall be considered as one of the objectives of Resource Adequacy. Technology options like renewable energy generation for round the clock energy supply backed with storage (Battery and PSP), …
3 matching passages in this document
Renewable Power Purchase Obligation Regulation, 2022
- Renewable Power Purchase Obligation (Compliance by Purchase … › 2. Definitions and interpretation'Renewable Energy with Storage Project' means a combination of renewable energy project with storage or a combination of renewable hybrid energy project with storage having a single point of injection or maximum two points of injection …
- 3. Renewable Power Purchase Obligation (RPPO) › (2) Roof-top Solar PV System… the energy generated from the Roof-top Solar PV System if it desires that such energy be counted towards meeting its RPPO. The solar generation meter shall be maintained by the Distribution Licensee at its cost; …
3 matching passages in this document
Framework for Resource Adequacy Regulation, 2026
- CHAPTER 4- GENERATION RESOURCE PLANNING › 9. Preparation of Generation Resource Planning… j) Renewable Purchase Obligation (RPO) including Energy Storage Obligation targets, etc.; k) Constraints such as penalties for unmet demand, forced outages, and system emission limits as defined in State Grid Code and Indian Electricity …
- ANNEXURE -I › Methodology for Preparation of Resource Adequacy Plan with …Fulfilment of Renewable Purchase Obligation shall be considered as one of the objectives of Resource Adequacy. Technology options like renewable energy generation for round the clock energy supply backed with storage (Battery and PSP), …
3 matching passages in this document
Procedure of verification of status of CGP, 2024
- Section 9 Captive Generation… of electricity by the captive user may be either directly or through Energy Storage System: Provided further that the consumption by a subsidiary company as defined in clause (87) of section 2 of the Companies Act, 2013 (18 of 2013) or …
- 9. Verification of the consumption criteria of CGP as …… Technical losses in electrical network and energy storage system shall be included in the energy consumption of the captive users. The losses figures shall be as derived from the published data wherever its done at regular intervals and …
3 matching passages in this document
Multi Year Tariff Regulation, 2023
1 amendment on Voltaic
- Note 2… Type of Station Auxiliary Energy Rotating Excitation 0.7% Static 1.0% Rotating Excitation 0.9% Static 1.2% 44.9 In case of In case of pumped storage hydro generating stations, …
- 48 Pumped Storage Hydro Generating Stations… 48.3 The Capacity Charge payable to a pumped storage hydel generating Station for a calendar month shall be: (AFC x NDM / NDY) (in Rupees), if actual Generation during the month is greater than or equal to 75 % of the Pumping Energy …
3 matching passages in this document
Terms and Conditions of Open Access Regulation, 2024
1 amendment on Voltaic
- Terms and Conditions of Open Access, Regulation, 2024 › Background… 'GEOA Rules' means Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2022 and its subsequent amendments; s) 'Green Energy' means the electrical energy from renewable sources of energy including Hydro and …
- Article-1 Definitions… i) 'Green Energy' means the electrical energy from renewable sources of energy including Hydro and Storage (if the storage uses Renewable Energy) or any other technology as may be notified by Government of India from time to time and …
3 matching passages in this document
State Electricity Grid Code Regulation, 2018
- PART A: GENERAL › 7. Role and Responsibility of Various entities… the CERC (Terms and conditions for recognition and issue of Renewable Energy certificate for Renewable Energy generation) Regulations 2010 [CERC (REC) Regulation] as amended from time to time. …
- PART A: GENERAL › 7. Role and Responsibility of Various entities… 2) SLDC shall communicate the energy injection reports of registered RE generators under REC mechanism to Central Agency that is NLDC and concerned RE generator on monthly basis as per the procedures / rules made by Central Agency for …
3 matching passages in this document