Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Terms and Conditions of Open Access Regulation, 2024

Telangana State Electricity Regulatory Commission (Terms and Conditions of Open Access), Regulation, 2024

RegulationDated 15 Mar 2024Published in the Gazette 18 Mar 2024No. TSERC/190/2024 dated 15.03.2024

1 amendment to it is on Voltaic, dated 24 Jan 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software, from pages 1 to 27 of 98. Check the regulator's original before you rely on it.

This is TSERC's 2024 consolidated open access regulation, notified as Regulation No.1 of 2024 and published in the Telangana Gazette on 18 March 2024 (p1). It is made under the Electricity Act, 2003 and is expressly framed to align state open access with the Ministry of Power's Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2022; the background recites the earlier APERC open access and balancing/settlement regulations that had been adopted by TSERC (p1–2). It extends to Telangana and comes into force on gazette publication (p2).

Clauses 1–3 set the title, definitions and applicability. The regulation applies to open access users, including captive users and GEOA users, using the intra-State transmission system and/or distribution systems, including in conjunction with inter-State transmission (p2–5). Clause 4 classifies users by the system they connect to, entry/exit location and duration: long-term, medium-term and short-term (p6). Clauses 5–9 designate the State Nodal Agency for each product, set criteria and procedures for allowing access, provide for annual verification of captive status (consumption and equity) and penalties for losing captive status, preserve existing open access arrangements, and set eligibility: open access above 1 MW contracted capacity, GEOA at 100 kW or more of contracted demand/sanctioned load (aggregated across connections in the same division), and no GEOA supply limit for captive consumers (p6–10).

Clauses 10–15 cover capacity allotment and applications. They establish priority for distribution licensees and longer-duration users, congestion handling including bidding for STOA on congested corridors, and detailed application, system-study, grant/refusal and deemed-grant timelines for LTOA, MTOA, STOA, GEOA and day-ahead GEOA, with GEOA routed through the central CNA portal (p10–20). Clauses 16–21 provide for the abstract of procedure, open access agreement execution and renewal, SEM metering, licensee studies to determine available capacity, underutilization/surrender and compensatory charges, and flexibility to change entry/exit points (p20–23). Clauses 22–25 set the charge heads (transmission/wheeling, cross-subsidy surcharge, additional surcharge, scheduling/SLDC, imbalance/deviation, reactive, standby, capital contribution), payment and billing terms, coordination and information-disclosure duties, quality-of-supply obligations, energy/demand balancing, and curtailment priority (p23–27). Part-B, the Balancing & Settlement Code, starts at clause 26 with day-ahead wheeling schedules in 15-minute blocks (p27). Throughout, the regulation relies on tariff orders and later Commission orders for charge levels and uses deemed-grant and deemed-concurrence mechanisms to keep timelines enforceable.

Standard name
Open Access Regulations, Green Energy Open Access Regulations, Balancing and Settlement Code
Primary topics
Open access, Green energy open access, Open access charges

Read with this

Amendments and corrections

Commencement notices and reasons

Procedures and orders made under it

Other copies of these documents (1)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of TSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document