Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
Showing the best matches for “energy storage obligation”: 12 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.
Framework for Resource Adequacy Regulations, 2024
- Power Procurement Planning › 14. Procurement Resource Mix… targets shall be carried out as per “AERC (Renewable Energy Purchase Obligation) Regulations, 2010” and amendments thereof. 14.5. The power procurement from Wind, Solar PV, Wind Solar Hybrid, Round the Clock (RTC) …
- Preliminary › 4. Definitions… storage systems for energy shift, and demand response measures for managing the intermittency and variability of renewable energy sources. aa. “Resource Adequacy Requirement” or “RAR” shall mean the requirement of resource capacity to be …
3 matching passages in this document
Ancillary Services Regulations, 2024
Electricity Grid Code Regulations, 2024
- 9.5 Control Hierarchy › 9.5.2 Primary Control… second for generating stations and energy storage systems and ten (10) seconds for the State control area. (n) As stated in IEGC, the actual frequency response characteristics of all the control areas within its region and the …
- 8.3 General Principles of Scheduling › 8.3.16 Scheduling of WS seller and ESS by QCA… The renewable energy generating station(s) or Projects based on energy storage system(s) connected at a particular InSTS substation or at multiple InSTS substations located in the State may appoint a QCA on their behalf to coordinate and …
3 matching passages in this document
Multi Year Tariff Regulations, 2024 — Generation, Transmission, SLDC, Distribution Wheeling and Retail Supply
- 45 Sale of Infirm Power › 50 Norms of operation for Hydro Generating Stations… beneficiaries shall be entitled to equivalent energy of 75% of the energy utilized in pumping the water from the lower elevation reservoir to the higher elevation reservoir from the generating station during peak hours and the generating …
- 52 Computation and Payment of Annual Fixed Charges and … › Pumped Storage Hydro Generating Stations… 54.9 The capacity charge payable to a pumped storage hydro generating station for a calendar month shall be: (AFC x NDM / NDY) (in Rupees), if actual Generation during the month is >= 75 % of the Pumping Energy consumed by the station …
2 matching passages in this document
Terms and Conditions for determination of Multi Year Tariff Regulations, 2021
- CHAPTER 6: COMPONENTS OF ARR AND TARIFF FOR GENERATION … › 50 Norms of operation for Hydro Generating Stations… beneficiaries shall be entitled to equivalent energy of 75% of the energy utilized in pumping the water from the lower elevation reservoir to the higher elevation reservoir from the generating station during peak hours and the generating …
- 54 Computation and Payment of Annual Fixed Charges and … › Pumped Storage Hydro Generating Stations… 54.9 The capacity charge payable to a pumped storage hydro generating station for a calendar month shall be: $(AFC \times NDM / NDY)$ (in Rupees), if actual Generation during the month is $\geq 75\%$ of the Pumping Energy consumed by the …
2 matching passages in this document
MYT Regulations, 2018 for Generation, Transmission, SLDC, Wheeling and Retail Supply
- 49 Norms of operation for Hydro Generating Stations… beneficiaries shall be entitled to equivalent energy of 75% of the energy utilized in pumping the water from the lower elevation reservoir to the higher elevation reservoir from the generating station during peak hours and the generating …
- Pumped Storage Hydro Generating Stations… 53.9 The capacity charge payable to a pumped storage hydro generating station for a calendar month shall be: (AFC x NDM / NDY) (in Rupees), if actual Generation during the month is >= 75 % of the Pumping Energy consumed by the station …
2 matching passages in this document
Multi Year Tariff Regulations, 2015 — Generation, Transmission, SLDC, Wheeling and Retail Supply
- 51 Norms of operation for Hydro Generating Stations… beneficiaries shall be entitled to equivalent energy of 75% of the energy utilized in pumping the water from the lower elevation reservoir to the higher elevation reservoir from the generating station during peak hours and the generating …
- 55 Computation and Payment of Annual Fixed Charges and … › Pumped Storage Hydro Generating Stations… 55.9 The capacity charge payable to a pumped storage hydro generating station for a calendar month shall be: (AFC x NDM / NDY) (in Rupees), if actual Generation during the month is >= 75 % of the Pumping Energy consumed by the station …
2 matching passages in this document
Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2024
- REGULATIONS › 2. Definition… “Group Net Metering” means an arrangement whereby surplus energy generated/injected from one or more Renewable Energy System or Battery Energy Storage System (BESS) charged through Renewable Energy System is exported to the grid through …
- REGULATIONS › 3. General & Applicability… are not covered under the category of domestic consumers and Renewable Energy Generators (3) The annual generation of Renewable Energy System or Renewable Energy System with Battery Energy Storage System may be capped as per the …
3 matching passages in this document
RPO Regulations, 2010 — Fourth Amendment, 2024
Amends the Renewable Purchase Obligation and its Compliance Regulations, 2010
- Assam Electricity Regulatory Commission (Renewable Purchase … › 2. Amendment of the Regulation 4.1 of the Principal …… to meet the shortfall in achievement of stipulated Wind renewable energy or Hydro renewable energy consumption. 6. The designated consumers who are open access consumers or consumers with Captive Power Plants shall fulfill their …
- NOTIFICATION › Assam Electricity Regulatory Commission (Renewable Purchase …Assam Electricity Regulatory Commission (Renewable Purchase Obligation and its Compliance) Regulations, 2010, (Fourth Amendment), 2024 No. AERC/578/2016/Pt I/76.- The Ministry of Power vide notification dated 20th October, 2023 in …
3 matching passages in this document
Terms and Conditions for Open Access Regulations, 2024
1 amendment on Voltaic
Terms and Conditions for Determination of Tariff Regulations, 2006
- 54. Definitions"Storage Type power station" means a hydro electric power generating station associated with large storage capacity to enable variation of generation of power according to demand; …
- 54. Definitions… "Auxiliary Energy Consumption" in relation to a period means the quantum of energy consumed by auxiliary equipment of the generating station, and shall be expressed as a percentage of the sum of gross energy generated at generator …
2 matching passages in this document
Grant of Connectivity to the Intra State Transmission System Regulations, 2025