Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
6 documents match “energy storage obligation”.
BESS Regulations, 2025 — Statement of Reasons
- 1. Short Title, Commencement, and Applicability › 2. Definitions… Energy Storage, etc., within license area. The aggregators shall assist the DISCOMs, inter alia, in the promotion of Distributed Generation/storage like Solar Rooftop projects with/without storage for all categories of consumers by …
- Commission's analysis and decision… further observes that BESS can act as a critical enabler for renewable energy integration, and consumption of RE stored in BESS should retain its renewable character. To incentivise storage-backed RE consumption, …
3 matching passages in this document
Renewable Power Purchase Obligation (Compliance by Purchase of RE/REC) Regulation, 2022 — Statement of Reasons
- ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION › Introduction… the Terms and Conditions for Renewable Energy Certificate for Renewable Energy Generation Regulations, 2022 issued by CERC on 09.05.2022 and the MOP notification dated 22.07.2022 on the Renewable Purchase Obligation and Energy Storage …
- Commission's analysis and decisionCommission's analysis and decision Grid-Scale energy storage technology is still in its nascent stage and costly and will take time to mature. Therefore, it is too early to specify a Storage Purchase Obligation.
3 matching passages in this document
Framework for Resource Adequacy Regulation, 2026 — Statement of Reasons
- 24. Timeline for Submission of State-specific Capacity … › Objections/views/comments… without considering fluctuating demand and existing PPAs ignores state obligations. Prayas (Energy Group) recommended that the Regulations also include compliance with the Energy Storage Obligation (ESO) targets notified by the Ministry …
- Generation Resource Parameters (Existing and Planned) › System Planning and Constraints… The RPO, including Energy Storage Obligation targets. Identified and listed constraints, such as penalties for unmet demand, forced outages, system emission limits defined by the State Grid Code and the Indian Electricity Grid Code, and …
3 matching passages in this document
RE Tariff Determination Regulation, 2025 — Statement of Reasons
- Annexure-1 List of Objectors › 2. Definitions and Interpretation… z) 'Renewable energy with storage project' means combination of renewable energy projects with storage or combination of renewable hybrid energy projects with storage at the same interconnection point; …
- Parameters for refuse-derived fuel (RDF) based municipal … › 71. Storage Efficiency… Provided that the minimum efficiency for storage based on the technology of solid-state batteries shall be 85%: (2) The efficiency of the storage component of renewable energy with storage project shall be measured as the ratio of output …
3 matching passages in this document
Green Energy Open Access, Charges and Banking Regulation, 2024 — First Amendment, 2025 — Statement of Reasons
- Commission's analysis and decision › Key aspects of the policy are… and hybrid energy sources, along with pumped storage projects. The democratisation of energy generation is supported by initiatives such as the PM Surya Ghar Yojana and PM KUSUM, promoting energy self-sufficiency. …
- 10. Clause 14.3 of the Principal Regulation shall be …… Provided further that, the lapsed unutilised surplus banked energy entitled for RECs, if not claimed by the renewable energy generating station, the DISCOMs shall account for such lapsed energy to meet their Renewable Purchase Obligation …
3 matching passages in this document
Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering Regulation, 2023 — Statement of Reasons
- 5. Capacity of Rooftop Systems… The capacity of Grid-Interactive SRTPVS with/without Battery Energy Storage System under Net/Gross metering or net billing mechanism or net feed-in to be installed at the premises of any individual prosumer shall not be less than 1 …
- (i) Sub-Clauses 4.1 & 4.2 › Draft… for setting up of the Grid-Interactive SRTPVS with/without Battery Energy Storage System. 4.2 Group of persons/Societies who are the consumers are also eligible for setting up the Grid Interactive SRTPVS with/ without Battery Energy …
3 matching passages in this document