Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

RE Tariff Determination Regulation, 2025 — Statement of Reasons

Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulation, 2025

Statement of reasonsDated 11 Sep 2025Regulation No.6 of 2025 dated 11.09.2025

The commission's reasons for the Regulation 6 of 2025 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software, from pages 1 to 33 of 54. Check the regulator's original before you rely on it.

This is APERC's combined Statement of Reasons/Order and the final text of the APERC (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulation, 2025 (Regulation No. 6 of 2025), dated 11.09.2025 (p1). The document is in three blocks: the Statement of Reasons pp1–16, Annexure I on p17, and Annexure II, the final Regulation, beginning p18 and continuing beyond the supplied pages (pp1, 16–18).

The Statement of Reasons records comments on the draft Regulation placed on the Commission's website on 27.05.2025 and the Commission's responses issue by issue (p1). It covers the control period and continuation after 31.03.2030 (p2), definitions and technology coverage (pp2–3), scope and standalone storage (pp3–4), capital cost and indexation (pp4–5), project-specific versus generic tariff and competitive bidding (pp6–7), levelised tariff (p7), over-generation and CUF/PLF (pp7–9), return on equity and income-tax pass-through (pp9–10), late payment surcharge (p10), subsidy and generation-based incentives (pp10–12), statutory charges (p12), wind hub height (pp12–13), O&M escalation (p13), fossil-fuel use (pp13–14), fuel cost (p14), biogas feedstock and manure income (pp14–15), other suggestions (p15), public hearing (pp15–16), and MSW projects (p16). It ends by saying that, except for the changes discussed, the draft was adopted and that the objector list is Annexure I and the final Regulation is Annexure II (p16).

Annexure I on p17 lists the 16 stakeholders who commented. Annexure II starts on p18 with the final Regulation’s preamble, reciting the Electricity Act provisions, the earlier 2008 and 2015 APERC regulations, the APTEL biomass/bagasse direction, the Supreme Court’s TATA Power judgment, the National Tariff Policy 2016, and the GoAP letter dated 05.02.2025 seeking adoption of the AP Integrated Clean Energy Policy, 2024 (pp18–21).

The final Regulation covers Regulations 1–16. Regulation 1 gives the title, territorial extent and commencement/continuation (p21). Regulation 2 defines terms from Act through Useful Life and Tariff Period (pp21–25). Regulation 3 states scope, preferring competitive bidding but applying the Regulation where Section 62 tariff determination is required (p26). Regulation 4 lists eligibility criteria by technology (pp26–28). Chapter 1, General Principles, Regulations 5–10, covers the Control Period, project-specific tariff, petition and public-notice procedure, tariff structure, levelised tariff design, and over-generation treatment (pp28–31). Chapter 2, Financial Principles, Regulations 11–16, covers capital cost, debt-equity ratio, loan tenure and interest, depreciation, return on equity, and interest on working capital (pp31–33).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (1)

Other copies of these documents (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document