APERC · Andhra Pradesh Electricity Regulatory Commission
Green Energy Open Access, Charges and Banking Regulation, 2024 — First Amendment, 2025 — Statement of Reasons
In the matter of the First Amendment to the Andhra Pradesh Electricity Regulatory Commission (Green Energy Open Access, Charges, and Banking) Regulation, 2024 (Regulation No. 3 of 2024)
Statement of reasonsDated 4 Dec 2025Regulation No. 11 of 2025 dated 04.12.2025
The commission's reasons for the Green Energy Open Access, Charges and Banking Regulation, 2024.
Summary
Summary written by software, from pages 1 to 33 of 52. Check the regulator's original before you rely on it.
This is the Andhra Pradesh Electricity Regulatory Commission's Statement of Reasons and order dated 4 December 2025 for the First Amendment to the APERC (Green Energy Open Access, Charges and Banking) Regulation, 2024 (Regulation No. 3 of 2024) (p1). It is a consultation record: page 1 sets out the two rounds of public notice (first draft 26.03.2025; revised draft published 19 August 2025; comment deadline extended to 15.09.2025), and pages 2–33 work through nine numbered amendment items, each giving the draft text, stakeholder objections, the Commission's analysis and the final modified clause.
Item (i) inserts a third proviso to Clause 7 allowing EV charging stations to procure input power through a Green Open Access generator, over APSPDCL's objection (p2). Item (ii), the longest, substitutes Clause 9: connectivity routed through Regulation No. 3 of 2017, day-ahead scheduling with block-wise energy settlement, banking of excess or under-drawn energy, treatment of over-injection above the approved OA quantum as inadvertent energy, aggregation rules where generation and consumer data are recorded at different granularity, apportionment or separate metering for additional GEOA capacity, a split of deviation settlement between Regulation No. 4 of 2017 and the CERC DSM Regulations, and transitional protection for wind, solar, hybrid and mini-hydel plants that took open access before the 2024 Regulation (pp2–10). The Commission declined to defer implementation, noting that the High Court suspended only clause 2 of the clarification dated 03.12.2024 and did not stay the Regulation.
Item (iii) rewrites Clause 10 on treatment of existing and new entities — grandfathering of pre-GEOA agreements, prospective application to new and additional-capacity applications, and an effective date tied to the first billing cycle after Gazette notification (pp10–13). Item (iv) deals with metering under Clause 11: smart meters mandatory for LT consumers/prosumers availing open access, check and standby meters not mandatory, and removal of the term 'renewable energy meter' (pp13–15).
Item (v) substitutes Clause 12(d), defining who must take a standby arrangement, how standby charges are levied, the notice and Letter of Credit requirements, extension of standby to co-located plants, and a sunset under which standby terms apply only to 31.03.2026 and move into RST Orders thereafter (pp15–20). Item (vi) adds a fifth proviso to Clause 13 exempting green hydrogen and derivatives, solar module and wind turbine manufacturing, and battery manufacturing projects from cross subsidy and/or additional surcharge for a fixed period from commissioning, with the DISCOM to claim the waiver from the State Government under section 65 (pp20–21).
Items (vii) to (ix) rework banking: Clause 14.1 sets a monthly billing cycle and the compensation rate for unutilised banked energy, with technology-wise tariffs fixed for projects commissioned in FY 2025-26 held constant for the term of the banking arrangement (pp21–25); Clause 14.3 fixes the banking entitlement as a share of consumption from the distribution licensee, treating the excess as lapsed, specifying the order in which lapsed energy is deducted across ToD slots and providing REC entitlement and DISCOM RPO/RCO accounting (pp25–29); Clause 14.4 governs ToD-wise banking and drawal, the adjustment hierarchy between peak, normal and off-peak slots, the bar on drawing banked energy during peak hours when R&C measures are in force, and the annual SLDC grid-level study that fixes a state-level banking cap with nodal-agency allocation (pp29–33).
Read with this
The regulation
- Dated 1 May 2024Green Energy Open Access, Charges and Banking Regulation, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 1 May 2024Order dated 01-05-2024
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.