CERC · Central Electricity Regulatory Commission
Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2020 — Draft
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020
Draft regulationDated 28 Apr 2020No.: RA-14026(11)/4/2020-CERC dated 28th April 2020
Draft
A proposal that has since been finalised as the RE Tariff Determination Regulations, 2020.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft CERC notification dated 28 April 2020 (p1) proposing the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020. It would set a Control Period from 1 July 2020 to 31 March 2023 (p1, p7) and govern CERC's determination of generic and project-specific tariffs for grid-connected renewable energy generating stations commissioned during that period under Sections 62 and 79 of the Electricity Act 2003 (p5).
Pages 1–7 define the regulated technologies and project categories — wind, small hydro, biomass Rankine, non-fossil co-generation, solar PV/floating solar/solar thermal, hybrid, biomass gasifier, biogas, MSW/RDF and RE-with-storage — and set eligibility conditions for each (p1–7). Pages 7–11 set general principles: the Control Period, which technologies receive annual generic tariffs versus case-by-case project-specific tariffs, petition requirements and fees, tariff structure and levelised design, and treatment of over-generation (p7–11).
Pages 11–16 set financial principles common to the tariff build-up: capital cost, debt-equity, loan tenure and interest, depreciation, return on equity, working capital, O&M escalation, rebate, late payment surcharge, subsidy/incentive treatment and statutory charges (p11–16). Pages 16–27 then set technology-specific parameters for each RE category, covering capital cost, CUF/PLF, auxiliary consumption, heat rate, GCV, fuel price, O&M and, for hybrid/storage projects, minimum CUF, storage efficiency and composite tariff design (p16–27).
Pages 27–28 contain miscellaneous provisions allowing deviations subject to the levelised normative tariff as ceiling, and powers to relax norms or remove difficulties (p27–28). Pages 29–35 append forms for project assumptions and tariff-component computations (p29–35). The document is headed 'Draft Notification' and ends with the Secretary's signature; it states commencement on 1.7.2020 and a validity up to 31.3.2023 unless reviewed or extended (p1, p28).
Read with this
The regulation
- Dated 23 Jun 2020RE Tariff Determination Regulations, 2020
Commencement notices and reasons
- Dated 7 Jul 2020RE Tariff Regulations, 2020 — Statement of Reasons
- Dated 27 Mar 2023RE Tariff Regulations, 2020 — applicability extension notification, 2023
- Dated 27 Mar 2023RE Tariff Regulations, 2020 — extension of applicability notification, 27 March 2023
- Dated 6 Sep 2023Notification – extension of applicability, 06.09.2023
- Dated 28 Mar 2024RE Tariff Regulations, 2020 — extension of applicability, 28.03.2024
Procedures and orders made under it
Other copies of these documents (1)
- Dated 23 Jun 2020Renewable Energy Sources Tariff Regulations, 2020
Earlier drafts
- Released with the draft dated 28 Apr 2020Explanatory memorandum: Draft RE Tariff Regulations, 2020 — Explanatory Memorandum
- Dated 29 Apr 2020Public notice: Public Notice on Draft Renewable Energy Sources Tariff Determination Regulations, 2020
- Dated 4 Jun 2020Hearing notice: Draft Renewable Energy Tariff Regulations, 2020 — Public Hearing Notice, 19.06.2020
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.