Skip to content

CERC · Central Electricity Regulatory Commission

Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2020 — Draft

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020

Draft regulationDated 28 Apr 2020No.: RA-14026(11)/4/2020-CERC dated 28th April 2020

Draft

A proposal that has since been finalised as the RE Tariff Determination Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft CERC notification dated 28 April 2020 (p1) proposing the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020. It would set a Control Period from 1 July 2020 to 31 March 2023 (p1, p7) and govern CERC's determination of generic and project-specific tariffs for grid-connected renewable energy generating stations commissioned during that period under Sections 62 and 79 of the Electricity Act 2003 (p5).

Pages 1–7 define the regulated technologies and project categories — wind, small hydro, biomass Rankine, non-fossil co-generation, solar PV/floating solar/solar thermal, hybrid, biomass gasifier, biogas, MSW/RDF and RE-with-storage — and set eligibility conditions for each (p1–7). Pages 7–11 set general principles: the Control Period, which technologies receive annual generic tariffs versus case-by-case project-specific tariffs, petition requirements and fees, tariff structure and levelised design, and treatment of over-generation (p7–11).

Pages 11–16 set financial principles common to the tariff build-up: capital cost, debt-equity, loan tenure and interest, depreciation, return on equity, working capital, O&M escalation, rebate, late payment surcharge, subsidy/incentive treatment and statutory charges (p11–16). Pages 16–27 then set technology-specific parameters for each RE category, covering capital cost, CUF/PLF, auxiliary consumption, heat rate, GCV, fuel price, O&M and, for hybrid/storage projects, minimum CUF, storage efficiency and composite tariff design (p16–27).

Pages 27–28 contain miscellaneous provisions allowing deviations subject to the levelised normative tariff as ceiling, and powers to relax norms or remove difficulties (p27–28). Pages 29–35 append forms for project assumptions and tariff-component computations (p29–35). The document is headed 'Draft Notification' and ends with the Secretary's signature; it states commencement on 1.7.2020 and a validity up to 31.3.2023 unless reviewed or extended (p1, p28).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

The regulation

Other copies of these documents (1)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document