CERC · Central Electricity Regulatory Commission

Renewable Energy Sources Tariff Regulations, 2020

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020

Regulation · Gazette copyDated 23 Jun 2020Published in the Gazette 19 Aug 2020In force from 1 Jul 2020RA-14026(11)/4/2020-CERC dated 23rd June, 2020

Replaced by Renewable Energy Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the RE Tariff Determination Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission issued these regulations on 23 June 2020 (p32); the Gazette cover prints 19 August 2020 (p1). They come into force on 1 July 2020 and, unless reviewed earlier or extended, remain in force up to 31 March 2023 (p32). They set the framework and norms for the Commission to determine generic and project-specific tariffs for grid-connected renewable energy generating stations commissioned during the Control Period, 1 July 2020 to 31 March 2023 (p35).

Regulations 1–4 (pp32–35) give the title, commencement, definitions, scope and technology-wise eligibility criteria. Chapter 1 (pp35–37) covers general principles: the Control Period, which technologies get generic tariff and which get project-specific tariff, the petition and fee requirements, tariff structure and design, and treatment of over-generation. Chapter 2 (pp37–40) sets financial principles: capital cost composition, debt-equity ratio, loan tenure and interest, depreciation, return on equity, working capital, CUF/PLF computation, O&M expenses, rebate, late payment surcharge, treatment of subsidies and incentives, and statutory charges.

Chapters 3–12 (pp40–46) give technology-specific parameters for wind, small hydro, biomass Rankine, non-fossil-fuel cogeneration, solar PV/thermal/floating, biomass gasifier, biogas, MSW/RDF, renewable hybrid, and renewable energy with storage. They specify which parameters the Commission will determine case by case and which are normative. Chapter 13 (p46) provides for deviation from norms by agreement subject to the normative levelized tariff as ceiling, and the Commission's power to relax and remove difficulties.

The Appendix (pp47–54) contains forms for tariff petitions: Form 1.1 (wind/small hydro/solar/hybrid/storage), Form 1.2 (biomass/MSW/RDF), and Form 2.1/2.2/2.3 templates for tariff component determination. Pages 1–31 are a Hindi contents/version with many gaps; the readable English text begins on p32.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document