Skip to content

CERC · Central Electricity Regulatory Commission

RE Tariff Regulations, 2020 — Statement of Reasons

Central Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2020 applicable from 1.07.2020 – Statement of Objects & Reasons (SOR) thereof

Statement of reasonsDated 7 Jul 2020No. RA-14026(11)/4/2020-CERC dated 7th July, 2020

Replaced by Renewable Energy Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the RE Tariff Determination Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 31 of 79. Check the regulator's original before you rely on it.

This is the Statement of Reasons (SoR) issued by CERC on 7 July 2020 (p1) to explain the final CERC (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2020. It is not the operative tariff regulation; it records the public consultation on the 29 April 2020 draft, the 48 stakeholder submissions, the 19 June 2020 video public hearing, and the Commission’s clause-by-clause analysis and decisions (pp1–2). The final regulations were notified on 23 June 2020 and apply from 1 July 2020 for the Control Period 1 July 2020 to 31 March 2023 (pp1–2, pp16–18).

The SoR works through definitions and eligibility first (pp3–16), then general tariff principles (pp16–30), then financial principles from p30. It explains changes and non-changes: small hydro useful life raised to match conventional hydro, biomass/MSW/RDF useful life revised, solar PV/floating/solar thermal and offshore wind retained; solar PV installed capacity clarified to include inverter nameplates; floating solar, small hydro, storage and pumped storage definitions modified; storage definition includes fuel cells and hydrogen; multiple injection points for hybrid/storage projects rejected; infirm power and COD definitions left to the Grid Code (pp3–13). Scope is limited to grid-connected RE projects commissioned in the Control Period whose tariff CERC determines under s.62 read with s.79; s.63 competitive-bid tariffs are not determined under these Regulations (pp13–15). Eligibility includes the 25% rated-capacity condition for renewable hybrid projects and same-interconnection-point storage projects (pp15–16). Generic tariff is confined to small hydro, biomass Rankine, non-fossil cogeneration, biomass gasifier and biogas; project-specific tariff remains available for solar, wind, hybrid, storage, waste-to-energy and new technologies, with financial/operational norms except capital cost as ceiling norms (pp18–22). The SoR details petition requirements, tariff structure, levelized tariff design, over-generation treatment, capital cost and debt-equity principles; it continues beyond p31 (pp22–31).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document