CERC · Central Electricity Regulatory Commission
RE Tariff Regulations, 2020 — Statement of Reasons
Central Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2020 applicable from 1.07.2020 – Statement of Objects & Reasons (SOR) thereof
Statement of reasonsDated 7 Jul 2020No. RA-14026(11)/4/2020-CERC dated 7th July, 2020
Replaced by Renewable Energy Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the RE Tariff Determination Regulations, 2020.
Summary
Summary written by software, from pages 1 to 31 of 79. Check the regulator's original before you rely on it.
This is the Statement of Reasons (SoR) issued by CERC on 7 July 2020 (p1) to explain the final CERC (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2020. It is not the operative tariff regulation; it records the public consultation on the 29 April 2020 draft, the 48 stakeholder submissions, the 19 June 2020 video public hearing, and the Commission’s clause-by-clause analysis and decisions (pp1–2). The final regulations were notified on 23 June 2020 and apply from 1 July 2020 for the Control Period 1 July 2020 to 31 March 2023 (pp1–2, pp16–18).
The SoR works through definitions and eligibility first (pp3–16), then general tariff principles (pp16–30), then financial principles from p30. It explains changes and non-changes: small hydro useful life raised to match conventional hydro, biomass/MSW/RDF useful life revised, solar PV/floating/solar thermal and offshore wind retained; solar PV installed capacity clarified to include inverter nameplates; floating solar, small hydro, storage and pumped storage definitions modified; storage definition includes fuel cells and hydrogen; multiple injection points for hybrid/storage projects rejected; infirm power and COD definitions left to the Grid Code (pp3–13). Scope is limited to grid-connected RE projects commissioned in the Control Period whose tariff CERC determines under s.62 read with s.79; s.63 competitive-bid tariffs are not determined under these Regulations (pp13–15). Eligibility includes the 25% rated-capacity condition for renewable hybrid projects and same-interconnection-point storage projects (pp15–16). Generic tariff is confined to small hydro, biomass Rankine, non-fossil cogeneration, biomass gasifier and biogas; project-specific tariff remains available for solar, wind, hybrid, storage, waste-to-energy and new technologies, with financial/operational norms except capital cost as ceiling norms (pp18–22). The SoR details petition requirements, tariff structure, levelized tariff design, over-generation treatment, capital cost and debt-equity principles; it continues beyond p31 (pp22–31).
Read with this
The regulation
- Dated 23 Jun 2020RE Tariff Determination Regulations, 2020
Commencement notices and reasons
- Dated 27 Mar 2023RE Tariff Regulations, 2020 — applicability extension notification, 2023
- Dated 27 Mar 2023RE Tariff Regulations, 2020 — extension of applicability notification, 27 March 2023
- Dated 6 Sep 2023Notification – extension of applicability, 06.09.2023
- Dated 28 Mar 2024RE Tariff Regulations, 2020 — extension of applicability, 28.03.2024
Procedures and orders made under it
Other copies of these documents (1)
- Dated 23 Jun 2020Renewable Energy Sources Tariff Regulations, 2020
Earlier drafts
- Dated 28 Apr 2020Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2020 — Draft
- Released with the draft dated 28 Apr 2020Explanatory memorandum: Draft RE Tariff Regulations, 2020 — Explanatory Memorandum
- Dated 29 Apr 2020Public notice: Public Notice on Draft Renewable Energy Sources Tariff Determination Regulations, 2020
- Dated 4 Jun 2020Hearing notice: Draft Renewable Energy Tariff Regulations, 2020 — Public Hearing Notice, 19.06.2020
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.