Notification – extension of applicability, 06.09.2023

NotificationDated 6 Sep 2023RA-14026(11)/4/2020-CERC dated 06th September, 2023

Replaced by Renewable Energy Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Read with the RE Tariff Determination Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page CERC notification (p1) extending the period of applicability of the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020. The recitals record that those regulations were originally applicable from 1 July 2020 to 31 March 2023 (p1), and that a notification dated 27 March 2023 had already extended them to 30 September 2023 (p1).

This notification, dated 6 September 2023 and issued under clause (2) of Regulation 1 of the same regulations, further extends that period to 31 March 2024 (p1). It is signed by the Secretary, Harpreet Singh Pruthi. Nothing else changes: no tariff norms, caps, procedures or definitions are touched, and no successor regulation is named. Its practical effect is to keep the 2020 RE tariff regime alive for a further six months, leaving open what governs renewable energy tariffs from 1 April 2024.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document