RegulationDated 23 Jun 2020In force from 1 Jul 2020RA-14026(11)/4/2020-CERC dated 23 rd June 2020

Replaced by Renewable Energy Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission's notification of 23 June 2020 (No. RA-14026(11)/4/2020-CERC) makes the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020, under s.61 read with s.178(2)(s) of the Electricity Act, 2003 (p1). They come into force on 1.7.2020 and, unless reviewed earlier or extended, remain in force up to 31.3.2023 (p1). That window is also the Control Period, and a tariff determined for a project commissioned in the Control Period stays valid for the project's whole tariff period, with the norms continuing until revised norms are notified (p8).

Regulations 1–4 (p1–7) set the short title and commencement, define the vocabulary the rest of the text runs on — renewable energy, storage, hybrid, floating solar, inter-connection point, useful life, control period and the fuel terms — and lay down scope and eligibility. The regulations apply to grid-connected renewable generating stations or units commissioned during the Control Period whose tariff CERC determines under s.62 read with s.79, with separate eligibility clauses defining what qualifies as each named technology, including a minimum rated-capacity ratio between sources for a renewable hybrid project (p5–7).

Chapter 1 (p8–11) carries the general principles: the Control Period, which technologies receive annual generic tariff and which require project-specific tariff, the contents of a tariff petition, the components of tariff and levelised tariff design. Chapter 2 (p11–16) is the common financial platform — capital cost scope, debt-equity, loan tenure and interest, depreciation, return on equity, working capital, O&M escalation, rebate, late payment surcharge, treatment of subsidy and statutory charges.

Chapters 3–12 (p16–28) each take one technology family and specify which parameters are normatively fixed and which CERC leaves to project-specific determination: wind, small hydro, biomass with Rankine cycle, non-fossil-fuel cogeneration, solar PV/thermal/floating solar, biomass gasifier, biogas, MSW and RDF, renewable hybrid, and RE with storage. Across them the text addresses capital cost, capacity utilisation and plant load factors, auxiliary consumption, station heat rate, gross calorific value, fuel prices with escalation, storage efficiency and tariff structure. Fossil-fuel use is barred except for biomass projects commissioned on or before 31.03.2017 (p20). Over-generation beyond the specified CUF or PLF may be sold, with the beneficiary holding first right of refusal (p11).

Chapter 13 (p28–29) allows tariff to be agreed between generating company and beneficiary in deviation from the norms, with the levelised normative tariff as the ceiling, and gives CERC power to relax provisions and to remove difficulties. The Appendix (p30–38) holds the five filing and computation forms (1.1, 1.2, 2.1, 2.2, 2.3).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.