CERC · Central Electricity Regulatory Commission
RE Tariff Determination Regulations, 2020
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020
RegulationDated 23 Jun 2020In force from 1 Jul 2020RA-14026(11)/4/2020-CERC dated 23 rd June 2020
Replaced by Renewable Energy Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Central Electricity Regulatory Commission's notification of 23 June 2020 (No. RA-14026(11)/4/2020-CERC) makes the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020, under s.61 read with s.178(2)(s) of the Electricity Act, 2003 (p1). They come into force on 1.7.2020 and, unless reviewed earlier or extended, remain in force up to 31.3.2023 (p1). That window is also the Control Period, and a tariff determined for a project commissioned in the Control Period stays valid for the project's whole tariff period, with the norms continuing until revised norms are notified (p8).
Regulations 1–4 (p1–7) set the short title and commencement, define the vocabulary the rest of the text runs on — renewable energy, storage, hybrid, floating solar, inter-connection point, useful life, control period and the fuel terms — and lay down scope and eligibility. The regulations apply to grid-connected renewable generating stations or units commissioned during the Control Period whose tariff CERC determines under s.62 read with s.79, with separate eligibility clauses defining what qualifies as each named technology, including a minimum rated-capacity ratio between sources for a renewable hybrid project (p5–7).
Chapter 1 (p8–11) carries the general principles: the Control Period, which technologies receive annual generic tariff and which require project-specific tariff, the contents of a tariff petition, the components of tariff and levelised tariff design. Chapter 2 (p11–16) is the common financial platform — capital cost scope, debt-equity, loan tenure and interest, depreciation, return on equity, working capital, O&M escalation, rebate, late payment surcharge, treatment of subsidy and statutory charges.
Chapters 3–12 (p16–28) each take one technology family and specify which parameters are normatively fixed and which CERC leaves to project-specific determination: wind, small hydro, biomass with Rankine cycle, non-fossil-fuel cogeneration, solar PV/thermal/floating solar, biomass gasifier, biogas, MSW and RDF, renewable hybrid, and RE with storage. Across them the text addresses capital cost, capacity utilisation and plant load factors, auxiliary consumption, station heat rate, gross calorific value, fuel prices with escalation, storage efficiency and tariff structure. Fossil-fuel use is barred except for biomass projects commissioned on or before 31.03.2017 (p20). Over-generation beyond the specified CUF or PLF may be sold, with the beneficiary holding first right of refusal (p11).
Chapter 13 (p28–29) allows tariff to be agreed between generating company and beneficiary in deviation from the norms, with the levelised normative tariff as the ceiling, and gives CERC power to relax provisions and to remove difficulties. The Appendix (p30–38) holds the five filing and computation forms (1.1, 1.2, 2.1, 2.2, 2.3).
Read with this
Commencement notices and reasons
- Dated 7 Jul 2020RE Tariff Regulations, 2020 — Statement of Reasons
- Dated 27 Mar 2023RE Tariff Regulations, 2020 — applicability extension notification, 2023
- Dated 27 Mar 2023RE Tariff Regulations, 2020 — extension of applicability notification, 27 March 2023
- Dated 6 Sep 2023Notification – extension of applicability, 06.09.2023
- Dated 28 Mar 2024RE Tariff Regulations, 2020 — extension of applicability, 28.03.2024
Procedures and orders made under it
Other copies of these documents (1)
- Dated 23 Jun 2020Renewable Energy Sources Tariff Regulations, 2020
Earlier drafts
- Dated 28 Apr 2020Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2020 — Draft
- Released with the draft dated 28 Apr 2020Explanatory memorandum: Draft RE Tariff Regulations, 2020 — Explanatory Memorandum
- Dated 29 Apr 2020Public notice: Public Notice on Draft Renewable Energy Sources Tariff Determination Regulations, 2020
- Dated 4 Jun 2020Hearing notice: Draft Renewable Energy Tariff Regulations, 2020 — Public Hearing Notice, 19.06.2020
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.