Skip to content

CERC · Central Electricity Regulatory Commission

Public Notice on Draft Renewable Energy Sources Tariff Determination Regulations, 2020

Draft Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020

Public notice on a draftDated 29 Apr 2020No. RA-14026(11)/4/2020-CERC dated 29th April, 2020

Draft

The draft has since been finalised as the RE Tariff Determination Regulations, 2020.

Public notice on the Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2020 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page CERC public notice dated 29 April 2020 (p1) announcing that the Commission has prepared the Draft Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020, framed under Section 61 read with Section 178(2)(s) of the Electricity Act, 2003 (p1). The notice does not reproduce the draft; it states that the draft is available on the Commission's website (p1).

Its operative purpose is consultation. Invoking Section 178(3) of the Act and the Electricity (Procedure for Previous Publication) Rules, 2005, the notice invites comments, suggestions and objections from stakeholders and interested persons on the provisions of the draft (p1). It sets out the two channels for responding — email to the Secretary, CERC at the addresses given, or upload through the SAUDAMINI Portal by registered users via the e-Regulation link on the e-filing home page — and gives the last date for submission as 28 May 2020 (p1). Contact details for the e-Court Helpdesk are provided for technical queries (p1).

For an analyst, the document is a procedural gateway rather than a substantive instrument: it fixes who may comment, how, and by when, but none of the tariff design itself.

Standard name
Renewable Energy Tariff Regulations

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document