CERC · Central Electricity Regulatory Commission
Public Notice on Draft Renewable Energy Sources Tariff Determination Regulations, 2020
Draft Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020
Public notice on a draftDated 29 Apr 2020No. RA-14026(11)/4/2020-CERC dated 29th April, 2020
Draft
The draft has since been finalised as the RE Tariff Determination Regulations, 2020.
Public notice on the Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2020 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page CERC public notice dated 29 April 2020 (p1) announcing that the Commission has prepared the Draft Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020, framed under Section 61 read with Section 178(2)(s) of the Electricity Act, 2003 (p1). The notice does not reproduce the draft; it states that the draft is available on the Commission's website (p1).
Its operative purpose is consultation. Invoking Section 178(3) of the Act and the Electricity (Procedure for Previous Publication) Rules, 2005, the notice invites comments, suggestions and objections from stakeholders and interested persons on the provisions of the draft (p1). It sets out the two channels for responding — email to the Secretary, CERC at the addresses given, or upload through the SAUDAMINI Portal by registered users via the e-Regulation link on the e-filing home page — and gives the last date for submission as 28 May 2020 (p1). Contact details for the e-Court Helpdesk are provided for technical queries (p1).
For an analyst, the document is a procedural gateway rather than a substantive instrument: it fixes who may comment, how, and by when, but none of the tariff design itself.
Read with this
The regulation
- Dated 23 Jun 2020RE Tariff Determination Regulations, 2020
Commencement notices and reasons
- Dated 7 Jul 2020RE Tariff Regulations, 2020 — Statement of Reasons
- Dated 27 Mar 2023RE Tariff Regulations, 2020 — applicability extension notification, 2023
- Dated 27 Mar 2023RE Tariff Regulations, 2020 — extension of applicability notification, 27 March 2023
- Dated 6 Sep 2023Notification – extension of applicability, 06.09.2023
- Dated 28 Mar 2024RE Tariff Regulations, 2020 — extension of applicability, 28.03.2024
Procedures and orders made under it
Other copies of these documents (1)
- Dated 23 Jun 2020Renewable Energy Sources Tariff Regulations, 2020
Earlier drafts
- Dated 28 Apr 2020Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2020 — Draft
- Released with the draft dated 28 Apr 2020Explanatory memorandum: Draft RE Tariff Regulations, 2020 — Explanatory Memorandum
- Dated 4 Jun 2020Hearing notice: Draft Renewable Energy Tariff Regulations, 2020 — Public Hearing Notice, 19.06.2020
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.