Skip to content

DERC · Delhi Electricity Regulatory Commission

Delhi Supply Code and Performance Standards Regulations, 2017

Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017

RegulationDated 7 Jul 2017In force from 1 Sep 2017No. F.17(85)/Engg./DERC/15-16/5109-----

6 amendments to it are on Voltaic, the latest dated 2 Jun 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software, from pages 1 to 45 of 121. Check the regulator's original before you rely on it.

These are the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017, notified by DERC under provisions of the Electricity Act, 2003 (p1). They apply to all distribution licensees, including deemed licensees, and all consumers in the National Capital Territory of Delhi, and come into force on 1.9.2017 (p1). The Gazette is only marked 'TO BE PUBLISHED'.

Chapter I (p1–8) contains the short title, extent and commencement, plus definitions and interpretation rules. The definitions cover the licensee-consumer relationship, applications, contract demand, correct meter, developer, franchisee, harmonics, maximum demand, net meter, point of supply, sanctioned load and service-line, among others (p1–8). Interpretation is to be consistent with the Act, Rules and Regulations, and undefined terms take meanings from the Act, CEA meter/safety regulations or the Tariff Order (p8).

Chapter II (p9–12) specifies the system of supply, including frequency and voltage levels/bands, safety of installations, consumer wiring standards, harmonics-dumping obligations, and distribution through a franchisee, with the licensee remaining responsible to consumers for franchisee operations (p9–12).

Chapter III (p13–43) is the largest part. It lays out the procedure for new and existing connections: application and documentary proof, field inspection and load sanction, demand notes, energisation timelines for electrified and unelectrified areas and augmentation cases, compensation for delay, single-point supply, full or partial conversion of single-point connections into individual connections, temporary connections, and existing-connection changes such as transfer, load enhancement/reduction, suo-motu reclassification and phase/voltage conversion (p13–43).

Chapter IV (p44–45) begins the agreement and miscellaneous charges provisions: what constitutes an agreement, termination and final billing, and the opening of security deposit provisions (p44–45).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Conditions of supply, Standards of performance, New connections and load changes

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of DERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document