HPERC · Himachal Pradesh Electricity Regulatory Commission
Security Deposit (Fourth Amendment) Regulations, 2021 — Draft
Himachal Pradesh Electricity Regulatory Commission (Security Deposit)( Fourth Amendment) Regulations, 2021
Draft amendmentDated 22 Apr 2021No. HPERC/414/(Security Deposit). dated 22nd April, 2021
Draft
A proposal that has since been finalised as the Security Deposit (Fourth Amendment) Regulations, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
HPERC's notification of 22 April 2021 publishes, for public objection, a draft Fourth Amendment to the Commission's (Security Deposit) Regulations, 2005 (pp1, 3). The preamble records that HPSEBL challenged the Third Amendment Regulations, 2020 before the Himachal Pradesh High Court, which on 27 November 2020 allowed HPSEBL to bring a revised proposal and ordered the 2020 amendments kept in abeyance while the Commission re-examined the issue, preferably before 4 June 2021 (pp1–2). HPSEBL's revised proposal of 20 March 2021 is the trigger for this draft (p2).
The draft rewrites the security-deposit regime rather than tweaking it. Regulation 4 replaces the table of initial security deposit rates per kW/kVA across consumer categories — tribal/remote, rural and urban domestic, commercial/NDNC, small and medium industry, irrigation and drinking-water pumping, bulk, temporary, street lighting and railway traction — for monthly and bi-monthly billing, with a 50% concession for BPL beneficiaries and definitions of the area categories (pp4–6). It also builds in an automatic escalation of those rates every three years, with new rates to be circulated and implemented on fixed annual dates (p6).
Other clauses change the base on which security deposits are reviewed to an average monthly bill net of arrears and subsidy over a shorter month multiplier, permit payment by electronic mode, and set the timing of the first review for connections released after 1 July 2021 (pp3–4, 6–7). The ceiling on additional security deposit demandable in a three-month period is replaced by payment in three equal quarterly instalments (p7). The load-reduction provisions are reworked so that the deposit is apportioned pro rata per kW/kVA, with a floor protecting the licensee (pp7–8).
The draft is not yet in force: it will be taken into consideration after 30 days from publication in the Rajpatra, with objections and suggestions to the Secretary at Shimla (pp2–3).
Read with this
The regulation
- Dated 30 Mar 2005Security Deposit Regulations, 2005
Amendments and corrections
- Dated 3 Nov 2011Security Deposit (First Amendment) Regulations, 2011
- Dated 3 Jul 2020Security Deposit Regulations, 2005 — Third Amendment, 2020
- Dated 9 Jul 2021Security Deposit (Fourth Amendment) Regulations, 2021
- Dated 21 Aug 2023Security Deposit (Fifth Amendment) Regulations, 2023
Commencement notices and reasons
Procedures and orders made under it
- Dated 19 Jan 2005Electricity Ombudsman Regulations, 2004 — First Amendment, 2005
Earlier drafts
- Dated 15 Feb 2020Security Deposit Regulations, 2005 — Third Amendment, 2020 — Draft
- Dated 15 Feb 2020Explanatory memorandum: Security Deposit Regulations, 2005 — Third Amendment, 2020 — Explanatory Memorandum — Draft
- Dated 10 Jul 2023Security Deposit (Fifth Amendment) Regulations, 2023 — Draft
- Dated 22 Apr 2021Explanatory memorandum: Security Deposit (Fourth Amendment) Regulations, 2021 — Explanatory Memorandum — Draft
One more document belongs here and is not on Voltaic: an amendment.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.