Security Deposit (Fourth Amendment) Regulations, 2021 — Draft

Himachal Pradesh Electricity Regulatory Commission (Security Deposit)( Fourth Amendment) Regulations, 2021

Draft amendmentDated 22 Apr 2021No. HPERC/414/(Security Deposit). dated 22nd April, 2021

Draft

A proposal that has since been finalised as the Security Deposit (Fourth Amendment) Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC's notification of 22 April 2021 publishes, for public objection, a draft Fourth Amendment to the Commission's (Security Deposit) Regulations, 2005 (pp1, 3). The preamble records that HPSEBL challenged the Third Amendment Regulations, 2020 before the Himachal Pradesh High Court, which on 27 November 2020 allowed HPSEBL to bring a revised proposal and ordered the 2020 amendments kept in abeyance while the Commission re-examined the issue, preferably before 4 June 2021 (pp1–2). HPSEBL's revised proposal of 20 March 2021 is the trigger for this draft (p2).

The draft rewrites the security-deposit regime rather than tweaking it. Regulation 4 replaces the table of initial security deposit rates per kW/kVA across consumer categories — tribal/remote, rural and urban domestic, commercial/NDNC, small and medium industry, irrigation and drinking-water pumping, bulk, temporary, street lighting and railway traction — for monthly and bi-monthly billing, with a 50% concession for BPL beneficiaries and definitions of the area categories (pp4–6). It also builds in an automatic escalation of those rates every three years, with new rates to be circulated and implemented on fixed annual dates (p6).

Other clauses change the base on which security deposits are reviewed to an average monthly bill net of arrears and subsidy over a shorter month multiplier, permit payment by electronic mode, and set the timing of the first review for connections released after 1 July 2021 (pp3–4, 6–7). The ceiling on additional security deposit demandable in a three-month period is replaced by payment in three equal quarterly instalments (p7). The load-reduction provisions are reworked so that the deposit is apportioned pro rata per kW/kVA, with a floor protecting the licensee (pp7–8).

The draft is not yet in force: it will be taken into consideration after 30 days from publication in the Rajpatra, with objections and suggestions to the Secretary at Shimla (pp2–3).

Standard name
Security Deposit
Primary topics
Security deposit

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document