Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Security Deposit Regulations, 2005

Himachal Pradesh Electricity Regulatory Commission (Security Deposit) Regulations, 2005

RegulationDated 30 Mar 2005F.No.HPERC/414 dated the March,2005

4 amendments to it are on Voltaic, the latest dated 21 Aug 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission issued these regulations under clauses (v) and (w) of s.181(2) read with s.47 of the Electricity Act, 2003. They apply to all distribution licensees in their licensed areas in Himachal Pradesh and come into force on publication in the Rajpatra, Himachal Pradesh; the Gazette date is not printed, and the notification date omits the day of the month (p1).

Regulation 2 defines the Act, applicant, Commission, consumption charges, licensee, month, person and State (p1–2). Regulation 3 requires a distribution licensee to demand security from any person seeking supply under s.43 and allows refusal of supply, line, plant or meter if security is not given (p2). Regulation 4 sets the ongoing security at an amount equivalent to consumption charges for the billing cycle; exempts pre-payment meter consumers and requires refund of existing deposits when a consumer opts for pre-payment; requires cash/demand draft and permits bank guarantee above a stated threshold (p2–3).

Regulation 5 sets initial security deposit flat rates per kW/kVA by area and consumer category, with explanations of remote/difficult/hard, rural, tribal and urban areas (p3–4). Regulation 6 provides annual review of security for poorly credit-rated consumers, demand notice for shortfalls, a de minimis threshold for no demand, simple interest for belated payment, and disconnection for non-payment (p4–5). Regulation 7 requires the licensee to pay simple interest at the Bank Rate on deposits, with exceptions, annual adjustment against consumer dues, separate accounting, and penal interest for delayed adjustment that is not passed through in the ARR (p5–6). Regulation 8 requires refunds on termination or reduction within one month, with interest for delay (p6). Regulation 9 requires annual credit rating and publication of habitual defaulters (p6). Regulations 10–12 cover removal of difficulties, issue of orders and practice directions, and final interpretation by the Commission (p6–7).

Standard name
Security Deposit
Primary topics
Security deposit, Metering

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document