HPERC · Himachal Pradesh Electricity Regulatory Commission

Security Deposit Regulations, 2005 — Third Amendment, 2020

Himachal Pradesh Electricity Regulatory Commission (Security Deposit) (Third Amendment) Regulations, 2020

AmendmentDated 3 Jul 2020No. HPERC/414/(Security Deposit):- dated the 3rd July, 2020

Amends the Security Deposit Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Third Amendment to HPERC's 2005 Security Deposit Regulations, notified at Shimla on 3 July 2020 (p1). It rewrites the core provisions on how a distribution licensee in Himachal Pradesh collects, reviews, tops up and refunds the security deposit taken from applicants and consumers. It takes effect from publication in the Rajpatra, Himachal Pradesh (p1).

Regulation 2 amends regulation 4 of the 2005 Regulations (p1–2): the initial deposit is restated in terms of connected load (single-part tariff) or contract demand (two-part tariff); the additional-deposit measure is recast around an average bill for (n+1.35) months, with 'n' defined as the billing-cycle months; the threshold above which a bank guarantee is required is raised from rupees ten lacs to rupees twenty five lacs (p2); bank-guarantee encashment timing is tightened; and a new sub-regulation (8) lets the licensee standardise the bank guarantee form on its website.

Regulation 3 substitutes regulation 5 wholesale (p3–5), setting out how the per-kW / per-kVA initial deposit rate is computed from a formula using load, working days, hours of use, demand factor and average tariff, with a category table of D, H and F values, a half-rate concession for BPL beneficiaries, and the annual cycle for working out and circulating rates — including a transitional direction to circulate rates for 1 October 2020 to 30 June 2021 before 30 September 2020.

Regulation 4 rewrites the general review in regulation 6 (p5–6): annual adequacy check on 1 July, special reviews, information formats for consumers above Rs 5 lacs, a Rs 500 de minimis, a 30% cap on additional deposits per three months, and single-notice recovery from poor credit-rated consumers.

Regulation 5 substitutes regulation 8(2) (p6–7) on refunds after permanent load reduction, with bank guarantee released first, a 30-day refund deadline and 12% simple interest for delay.

Standard name
Security Deposit
Primary topics
Security deposit

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document