Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Electricity Ombudsman Regulations, 2004 — First Amendment, 2005

Himachal Pradesh Electricity Regulatory Commission (Electricity Ombudsman) (First Amendment) Regulations, 2005

OrderDated 19 Jan 2005No.HPERC/609-B dated 19th January,2005

Made under the Security Deposit Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page notification from the Himachal Pradesh Electricity Regulatory Commission (Shimla, 19 January 2005) making the first amendment to its Electricity Ombudsman Regulations, 2004 (p1). It is a narrow instrument: it settles who pays for the Ombudsman, and how, and adds a procedural hook to the Ombudsman's own conduct of business.

Regulation 1 gives the short title and commencement — in force from publication in the Rajpatra, Himachal Pradesh; the Gazette date itself is not printed (p1).

Regulation 2 substitutes sub-regulation (5) of regulation 3 of the principal regulations: the Ombudsman's salary, allowances and other terms of appointment are to be determined by the Commission from time to time, and borne by the distribution licensees in the proportions and manner the Commission determines (p1). The amendment deliberately leaves the quantum and allocation to later Commission determination rather than fixing them.

Regulation 3 replaces regulation 6 entirely, creating a Secretariat for the Ombudsman, placing its cost on the distribution licensees in proportions the Commission determines, and providing that the entire expense of the Ombudsman's office — salaries, honorarium and allowances of the Ombudsman and staff — be allowed as a pass-through in the distribution licensees' Annual Revenue Requirements (p1–2).

Regulation 4 inserts into regulation 7(2) a requirement that the Ombudsman conduct business in accordance with these regulations and with procedures for conduct of business laid by him with the Commission's approval (p2).

Net effect: the Ombudsman institution is funded by distribution licensees and recovered through ARR, with the Commission retaining control over quantum and allocation. Nothing here touches the substance of consumer grievance handling.

Standard name
CGRF and Ombudsman
Primary topics
Electricity ombudsman, ARR and true-up

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document