Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Security Deposit (Fourth Amendment) Regulations, 2021 — Explanatory Memorandum — Draft

Explanatory Memorandum to the draft of Himachal Pradesh Electricity Regulatory Commission (Security Deposit) (Fourth Amendment) Regulations, 2021.

Explanatory memorandum to a draftDated 22 Apr 2021

Draft

The draft has since been finalised as the Security Deposit (Fourth Amendment) Regulations, 2021.

Explanatory memorandum to the Security Deposit (Fourth Amendment) Regulations, 2021 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is HPERC's explanatory memorandum to the draft Fourth Amendment of its 2005 Security Deposit Regulations. It explains why the Commission proposes to revisit the security deposit rules and invites stakeholder comments on the draft (p1, p3).

The memorandum first recaps the 2005 principal regulations and their first and second amendments (p1), then the Third Amendment Regulations, 2020 notified on 3 July 2020 and published in the Rajpatra on 4 July 2020 (p1). It records that HPSEBL filed OMP No. 378 of 2020 before the Himachal Pradesh High Court, arguing that the 2020 increase in security deposit was disproportionate and would deny electricity connections to rural people and poor farmers (p1). The High Court, by order dated 27 November 2020, allowed HPSEBL to approach HPERC with a revised proposal, directed that the 2020 amended regulations be kept in abeyance, and listed the matter for 04.06.2021 (p1-2).

HPSEBL submitted its revised proposal on 20.03.2021, proposing substitution of the factor in regulation 4(3) of the Third Amendment Regulations, 2020 with a lower factor, flat initial deposit rates 2 to 2.5 times the 2004-05 rates, review after six months, and reductions in the temporary disconnection period and bill due date (p2).

The Commission largely follows HPSEBL but makes need-based changes: it proposes increasing initial security deposit rates by 2 to 2.5 times for all categories except Domestic Consumers (all areas) and certain categories in Tribal, Remote and Hard areas; reviewing security deposit annually on average monthly billing for (n+1) months instead of HPSEBL's (n+1.25) or the earlier (n+1.35), noting State Government advice under section 108 of the Act to adopt (n+1); and setting the first review for new connections on the first day of the quarter immediately preceding the quarter in which the six-month period from connection expires (p3). It does not accept the reduction in temporary disconnection period or due date because those matters are outside the Security Deposit Regulations (p3). The draft amendment regulations are notified for stakeholder comments (p3).

Standard name
Security Deposit
Primary topics
Security deposit

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document