Security Deposit (Fourth Amendment) Regulations, 2021

Himachal Pradesh Electricity Regulatory Commission (Security Deposit)( Fourth Amendment) Regulations, 2021

AmendmentDated 9 Jul 2021No. HPERC/414/(Security Deposit) dated 9th July, 2021

Amends the Security Deposit Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a six-clause amendment notification by the Himachal Pradesh Electricity Regulatory Commission, issued at Shimla on 9 July 2021, which rewrites parts of the State's principal Security Deposit Regulations. It is made under clauses (v) and (w) of section 181(2) read with section 47 of the Electricity Act, 2003, and takes effect from publication in the Rajpatra (p1).

Clauses 2 and 3 make mostly drafting and procedural changes to the parent regulation 3 (p1) and regulation 4 (p1–2): the initial security deposit is re-based on the average monthly bill net of arrears and subsidy for a stated number of months rather than the earlier average-bill formula, refund of a consumer's deposit after a prepaid meter replaces a postpaid one must be netted against outstanding dues within the regulation 8 timelines, and cash/demand-draft-only payment is widened to include electronic mode in several sub-regulations.

Clause 4 is the substantive core (p2–5). It substitutes a fresh rate table for the initial security deposit per kW/kVA, differentiated by billing cycle (monthly vs bi-monthly) and by consumer category and area type — domestic, commercial/NDNC, small and medium industry, large industry, bulk, temporary metered, street lighting, railway traction, IDWPS — with separate treatment for tribal/remote/hard areas, rural areas and urban areas. It gives BPL domestic beneficiaries a discounted deposit, allows phased payment of the deposit where load is built up in stages within a maximum period tied to the Supply Code 2009, defines the area and BPL categories in an Explanation, and sets a periodic escalation mechanism with a fixed circulation and implementation calendar.

Clause 5 amends the review machinery in regulation 6 (p5–6): a special date for the FY 2021-22 annual review, a rule for the first review of connections released after 1 August 2021, and installment-based recovery of additional security deposit demanded on review. Clause 6 amends regulation 8 (p6–7) so that deposits are adjusted pro rata on load reduction, with a floor proviso protecting the minimum retained amount.

Standard name
Security Deposit
Primary topics
Security deposit

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document