Himachal Pradesh Electricity Regulatory Commission (Security Deposit)( Fourth Amendment) Regulations, 2021
AmendmentDated 9 Jul 2021No. HPERC/414/(Security Deposit) dated 9th July, 2021
Amends the Security Deposit Regulations, 2005.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a six-clause amendment notification by the Himachal Pradesh Electricity Regulatory Commission, issued at Shimla on 9 July 2021, which rewrites parts of the State's principal Security Deposit Regulations. It is made under clauses (v) and (w) of section 181(2) read with section 47 of the Electricity Act, 2003, and takes effect from publication in the Rajpatra (p1).
Clauses 2 and 3 make mostly drafting and procedural changes to the parent regulation 3 (p1) and regulation 4 (p1–2): the initial security deposit is re-based on the average monthly bill net of arrears and subsidy for a stated number of months rather than the earlier average-bill formula, refund of a consumer's deposit after a prepaid meter replaces a postpaid one must be netted against outstanding dues within the regulation 8 timelines, and cash/demand-draft-only payment is widened to include electronic mode in several sub-regulations.
Clause 4 is the substantive core (p2–5). It substitutes a fresh rate table for the initial security deposit per kW/kVA, differentiated by billing cycle (monthly vs bi-monthly) and by consumer category and area type — domestic, commercial/NDNC, small and medium industry, large industry, bulk, temporary metered, street lighting, railway traction, IDWPS — with separate treatment for tribal/remote/hard areas, rural areas and urban areas. It gives BPL domestic beneficiaries a discounted deposit, allows phased payment of the deposit where load is built up in stages within a maximum period tied to the Supply Code 2009, defines the area and BPL categories in an Explanation, and sets a periodic escalation mechanism with a fixed circulation and implementation calendar.
Clause 5 amends the review machinery in regulation 6 (p5–6): a special date for the FY 2021-22 annual review, a rule for the first review of connections released after 1 August 2021, and installment-based recovery of additional security deposit demanded on review. Clause 6 amends regulation 8 (p6–7) so that deposits are adjusted pro rata on load reduction, with a floor proviso protecting the minimum retained amount.
Read with this
The regulation
- Dated 30 Mar 2005Security Deposit Regulations, 2005
Amendments and corrections
- Dated 3 Nov 2011Security Deposit (First Amendment) Regulations, 2011
- Dated 3 Jul 2020Security Deposit Regulations, 2005 — Third Amendment, 2020
- Dated 21 Aug 2023Security Deposit (Fifth Amendment) Regulations, 2023
Commencement notices and reasons
Procedures and orders made under it
- Dated 19 Jan 2005Electricity Ombudsman Regulations, 2004 — First Amendment, 2005
Earlier drafts
- Dated 15 Feb 2020Security Deposit Regulations, 2005 — Third Amendment, 2020 — Draft
- Dated 15 Feb 2020Explanatory memorandum: Security Deposit Regulations, 2005 — Third Amendment, 2020 — Explanatory Memorandum — Draft
- Dated 22 Apr 2021Security Deposit (Fourth Amendment) Regulations, 2021 — Draft
- Dated 22 Apr 2021Explanatory memorandum: Security Deposit (Fourth Amendment) Regulations, 2021 — Explanatory Memorandum — Draft
- Dated 10 Jul 2023Security Deposit (Fifth Amendment) Regulations, 2023 — Draft
One more document belongs here and is not on Voltaic: an amendment.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.