Gujarat Electricity Distribution Code, 2004 — Second Amendment, 2016

Gujarat Electricity Distribution Code (Second Amendment),2016

AmendmentDated 4 Feb 2016Published in the Gazette 5 Feb 2016NotificationNo. I of 20lb

Amends the Gujarat Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's Distribution Code (Second Amendment), 2016 — Notification No. 1 of 2016, gazetted in the Gujarat Government Gazette, Part IV-C, Vol. LVIII of Friday 5 February 2016, and signed by the Commission's Secretary (p1–2). It amends the GERC Distribution Code (No. 6 of 2004), called the principal Code, through five clauses that substitute existing provisions rather than rewriting the Code (p1).

Clause 1 gives the short title and commencement: the amendment comes into force on the date of publication in the Gazette, so the gazette date — 5 February 2016 — is the operative date (p1).

Clause 2 substitutes Section 4.5(12) of the principal Code, restating the principle governing distribution system planning: cost effectiveness and reduction of energy losses, without sacrificing the security, safety and power-quality standards of the distribution system (p1).

Clause 3 substitutes a section on communication. The clause heading on p2 cites Section 6.2(1) of the principal Code, while the operative words substitute Section 6.7(1) — an internal inconsistency in the text. The substituted provision requires consumers with contract demand of 1 MW and above to make available reliable, redundant communication links — round-the-clock e-mail, telephone, fax and the like — for data exchange and operating instructions between the Licensee, Consumer, LMU, Sub-SLDC and SLDC, and places on each distribution utility the duty to ensure installation and maintenance of proper communication infrastructure at the consumer end (p2).

Clause 4 substitutes Section 6.9(1), requiring the Distribution Licensee, its Users (generation companies, the transmission licensee, consumers with load above 5 MW or dedicated lines) and any other distribution licensee with a common electrical interface to designate — and promptly update each other on — "Control Persons" responsible for safety co-ordination, with designations, e-mail ids and telephone numbers exchanged (p2).

Clause 5 substitutes Clause 12(1) of Attachment I, on metering installation: for 230 V single-phase and 400 V three-phase supply the meters and associated equipment must sit in tamper-proof, lockable, sealable boxes of sufficient strength and heat dissipation, with the required electrical clearances and a design that lets readings be taken without access to the meter or its connections (p2).

Standard name
Distribution Code
Primary topics
Distribution system planning and operation, Communication and SCADA, Metering

Read with this

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document