GERC · Gujarat Electricity Regulatory Commission

Gujarat Electricity Distribution Code — Third Amendment, 2017 — Draft

Gujarat Electricity Distribution Code (Third Amendment), 2017

Draft amendmentDated 9 May 2017Notification No. 1 of 2017 dated 09/05/2017

Draft

A proposal that has since been finalised as the Gujarat Electricity Distribution Code, 2004 — Third Amendment, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's Third Amendment to the Gujarat Electricity Distribution Code (No. 6 of 2004), issued as Notification No. 1 of 2017 and signed at Gandhinagar on 09/05/2017 (p1, p6). It works as a clause-by-clause substitution of named provisions of the principal Code and comes into force on publication in the Gazette (p1).

The changes run across most of the Code. Clause 2 inserts a Force Majeure definition into Section 2 (p1). Clauses 3–4 replace Section 4 provisions — one on standardising equipment and system-design parameters so spares can be interchanged, and one on the licensee's system-wide energy audit and feeder-wise distribution-loss computation (p1–2). Clause 5 restates the supply-voltage ladder and ownership boundary for EHT/HT consumers (p2). Clauses 6–7 deal with voltage management in the distribution system and with users' duty to keep apparatus conforming to the CEA Safety Regulations, 2010 (p3). Clauses 8–10 set the minimum operational metering at substations and users' systems, and the protective-relay settings and relay types for distribution lines (p3–5). Clause 11 revises incident reporting, including oral reporting and written-report timelines (p5). Clauses 12–14 amend Attachment-1 on distribution-network service areas, reliability-index factors and single-contingency load interruption (p5–6).

Standard name
Distribution Code
Primary topics
Technical standards, Metering, Distribution system planning and operation

Read with this

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗