GERC · Gujarat Electricity Regulatory Commission
Draft Distribution Code (Third Amendment), 2017 — Explanatory Memorandum
Draft Distribution Code (Third Amendment), 2017
Explanatory memorandum to a draftDated 8 May 2017
Draft
The draft has since been finalised as the Gujarat Electricity Distribution Code, 2004 — Third Amendment, 2017.
Explanatory memorandum to the Gujarat Electricity Distribution Code — Third Amendment, 2017 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's explanatory memorandum for the Draft Distribution Code (Third Amendment), 2017, which would amend the Gujarat Electricity Distribution Code, 2004 (p1). It recites the Code's enabling provisions and its two earlier amendments, of 26 October 2006 and 5 February 2016, and explains that the Distribution Code Review Panel — constituted under Section 3.4 of the principal code and last reconstituted by letter of 5 February 2016 — maintains the Code under continuous scrutiny and review (p1).
The Panel met on 11 November 2016, deliberated on agenda items from its members and proposed the amendments now before the Commission (p1). Two changes are put forward: including a definition of Force Majeure, and extending the Code to the 33 kV network existing in Gujarat (p1). The memorandum states the Commission's intention to amend the principal code; it does not reproduce the amendment clauses, nor any Gazette, consultation or in-force date (p1).
Read with this
The regulation
- Dated 24 Aug 2004Gujarat Electricity Distribution Code
Amendments and corrections
Earlier drafts
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.