Gujarat Electricity Distribution Code, 2004 — First Amendment, 2006

Gujarat Electricity Distribution Code (First Amendment), 2006

AmendmentDated 26 Oct 2006Published in the Gazette 26 Oct 2006No. GERC/TECH-I/2296/2006 dated 26th October, 2006

Amends the Gujarat Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page amendment by the Gujarat Electricity Regulatory Commission to the Gujarat Electricity Distribution Code (No.6 of 2004), the principal Code. It was issued on 26 October 2006 and published in the Gujarat Government Gazette the same day (p1). Under clause 1 the amendment is cited as the Gujarat Electricity Distribution Code (First Amendment), 2006 and comes into force on the date of its publication in the Gazette (p2).

Clause 2 substitutes section 3.3.1 of the principal code. It restates the composition of the Distribution Code Review Panel: part-time chairperson and members, with the chairperson drawn from GETCO and a rotating Member-secretary nominated by GERC from among the distribution licensees. It then prescribes the categories of members to be drawn from distribution licensees, the STU/SLDC, transmission licensees and captive/co-generation and conventional/non-conventional generators, including rotation arrangements, and requires GERC to maintain a list of potential candidates balancing interest groups (p2).

Clause 3 substitutes section 7.1.1 of the principal code, restating its scope over operational, tariff and commercial metering and protection guidelines for the distribution system, and inserts a proviso giving Central Electricity Authority regulations on installation and operation of meters precedence over provisions 7.2 to 7.4 of the Distribution Code (p2).

Standard name
Distribution Code
Primary topics
Metering, Distribution system planning and operation

Read with this

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document