Skip to content

GERC · Gujarat Electricity Regulatory Commission

Gujarat Electricity Distribution Code, 2004 — Third Amendment, 2017

Gujarat Electricity Distribution Code (Third Amendment), 2017

AmendmentDated 30 Jun 2017Published in the Gazette 30 Jun 2017Notification No. 1 of 2017 dated 30/06/2017

Amends the Gujarat Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the third amendment to the Gujarat Electricity Regulatory Commission's Distribution Code (No. 6 of 2004), notified as Notification No. 1 of 2017 and published in the Gujarat Government Gazette (Extraordinary, Part IV-C) on 30 June 2017 (p1). It is a clause-by-clause substitution exercise: the opening clause gives the short title and states the amendment comes into force on the date of gazette publication, and the remaining clauses replace specified sub-provisions of the principal Code (p1–4).

The amendments touch five areas. Section 4 changes standardise substation and equipment design parameters to ease replacement and reduce spare inventories, and rewrite the energy-audit obligation, requiring measurement at outgoing feeder terminal switchgear, comparison with monthly sales, feeder-wise distribution loss computation, and a fallback for ring-main networks (p1–2). Section 5 restates the supply voltages and ownership/boundary arrangements for EHT/HT consumers, including who owns the substation (p2). Section 6 requires the licensee to manage voltage in the distribution system beyond the transmission connection point and to operate capacitors for reactive compensation (p2), and obliges Users to keep apparatus conforming to the CEA Safety and Electric Supply Regulations, 2010 (p2).

Section 7 governs protection: relay settings and coordination among licensees and generating companies, notification of settings to Users, routine relay checks, short-circuit studies and periodic joint meetings (p2–3), plus the minimum over-current and earth-fault relay requirements for radial versus parallel/ring feeders. Section 9 sets oral and written incident-reporting timelines, with escalated timelines for major incidents (p3).

Attachment-1 amendments cover distribution network service-area planning and interconnection, the factors to be considered when computing reliability indices, the single-contingency load-interruption limit with a multi-year reduction target, and design arrangements for transformer and feeder failures (p3–4). Annexure-2 amendments prescribe the scale and content of the licensee's distribution map and the substation metering and relaying details to be furnished (p4).

Standard name
Distribution Code
Primary topics
Technical standards, Losses and loss reduction, Power quality

Read with this

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document