GERC · Gujarat Electricity Regulatory Commission
Gujarat Electricity Distribution Code — Second Amendment, 2015 — Draft
Gujarat Electricity Distribution Code (Second Amendment), 2015
Draft amendmentDated 16 Dec 2015
Draft
A proposal that has since been finalised as the Gujarat Electricity Distribution Code, 2004 — Second Amendment, 2016.
Summary
Summary written by software. Check the regulator's original before you rely on it.
GERC's draft second amendment to the Gujarat Electricity Distribution Code, 2004, issued under the Electricity Act 2003 and the Gujarat reorganisation Act 2003. Pages 1–2 contain four substitution clauses. Clause 2 replaces Section 4.5(12) to require distribution-system planning to balance cost-effectiveness and loss reduction with security, safety and power-quality standards (p1). Clause 3 replaces Section 6.7(1) to require reliable, redundant communication links — including a round-the-clock e-mail id — from consumers with contract demand of 1 MW and above, and places an installation/maintenance duty on each distribution utility (p1). Clause 4 replaces Section 6.9(1) to require distribution licensees and Users (generation companies, transmission licensee, consumers above 5 MW or with dedicated lines, and interconnected distribution licensees) to designate Control Persons for safety co-ordination and exchange their details (p2). Clause 5 replaces Attachment 1 clause 12(1) to require tamper-proof metering boxes for 230 V single-phase and 400 V three-phase supplies, with design, locking/sealing, heat-dissipation and reading-access specifications (p2). Page 3 is the explanatory statement: it records the Distribution Code Review Panel's proposal, explains power-quality, e-mail, 1 MW threshold, Control Person and tamper-proof metering changes, and mentions alignment with Intra-State Open Access and Supply Code Regulations. It also says a security deposit refund time limit is being incorporated. Commencement is on Gazette publication; the Gazette date is not printed (p1–2).
Read with this
The regulation
- Dated 24 Aug 2004Gujarat Electricity Distribution Code
Amendments and corrections
Earlier drafts
- Dated 9 May 2017Gujarat Electricity Distribution Code — Third Amendment, 2017 — Draft
- Dated 8 May 2017Explanatory memorandum: Draft Distribution Code (Third Amendment), 2017 — Explanatory Memorandum
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.