Skip to content

GERC · Gujarat Electricity Regulatory Commission

Gujarat Electricity Distribution Code — Second Amendment, 2015 — Draft

Gujarat Electricity Distribution Code (Second Amendment), 2015

Draft amendmentDated 16 Dec 2015

Draft

A proposal that has since been finalised as the Gujarat Electricity Distribution Code, 2004 — Second Amendment, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

GERC's draft second amendment to the Gujarat Electricity Distribution Code, 2004, issued under the Electricity Act 2003 and the Gujarat reorganisation Act 2003. Pages 1–2 contain four substitution clauses. Clause 2 replaces Section 4.5(12) to require distribution-system planning to balance cost-effectiveness and loss reduction with security, safety and power-quality standards (p1). Clause 3 replaces Section 6.7(1) to require reliable, redundant communication links — including a round-the-clock e-mail id — from consumers with contract demand of 1 MW and above, and places an installation/maintenance duty on each distribution utility (p1). Clause 4 replaces Section 6.9(1) to require distribution licensees and Users (generation companies, transmission licensee, consumers above 5 MW or with dedicated lines, and interconnected distribution licensees) to designate Control Persons for safety co-ordination and exchange their details (p2). Clause 5 replaces Attachment 1 clause 12(1) to require tamper-proof metering boxes for 230 V single-phase and 400 V three-phase supplies, with design, locking/sealing, heat-dissipation and reading-access specifications (p2). Page 3 is the explanatory statement: it records the Distribution Code Review Panel's proposal, explains power-quality, e-mail, 1 MW threshold, Control Person and tamper-proof metering changes, and mentions alignment with Intra-State Open Access and Supply Code Regulations. It also says a security deposit refund time limit is being incorporated. Commencement is on Gazette publication; the Gazette date is not printed (p1–2).

Standard name
Distribution Code
Primary topics
Distribution system planning and operation, Power quality, Metering

Read with this

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document