CERC · Central Electricity Regulatory Commission
Unscheduled Interchange Charges and Related Matters Regulations, 2009 — Statement of Objects and Reasons
Statement of Objects and Reasons
Statement of reasonsDated 8 Jun 2009No. L‐7/ 1(1)2009 ‐ CERC dated 8th June 2009
Replaced by Deviation Settlement Mechanism and related matters Regulations, 2014
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Unscheduled Interchange Charges and Related Matters Regulations, 2009 or one of its amendments.
Summary
Summary written by software, from pages 1 to 45 of 48. Check the regulator's original before you rely on it.
This is CERC's Statement of Objects and Reasons for the Central Electricity Regulatory Commission (Unscheduled Interchange charges and related matters) Regulations, 2009. It records that the draft regulations and explanatory memorandum were published by public notice dated 23.2.2009 and that stakeholder comments were received and listed at Annexure-I, after which the regulations were finalised (p1–2). The document is therefore a reasons-and-comment record rather than the operative regulation itself.
The early sections deal with definitions. The Commission rejects expanding the definitions of buyer and seller to include beneficiary and generating station, preserves the separate identities of beneficiaries and generating stations for long-term transactions, accepts including the National Load Despatch Centre in the definition of Load Despatch Centre, and declines to add definitions of Person or Transaction Scheduled because the regulations already refer to the Act, Grid Code and CERC Tariff Regulations, 2009 (p2–4).
Sections 5–7 contain the main UI pricing discussion. Stakeholders commented on the UI rate vector and ceiling rate; the Commission explains that UI pricing must balance grid discipline, cost recovery and discouraging UI as a trading instrument, and justifies its revised ceiling by reference to the variable cost of naphtha/RLNG combined-cycle central generating stations (p4–9). It adopts a gradual reduction in the operating frequency band rather than the range suggested by some stakeholders (p9–13), and creates a bi-directional UI price cap applicable to CERC-regulated generating stations using only coal, lignite or APM gas as fuel, while excluding other categories (p13–18).
Sections 8–13 address merchant power plants, review of the UI mechanism, inter-regional UI accounting and settlement, station-wise versus stage-wise UI accounting for multi-stage stations, generation limits, and schedule-revision time blocks. The Commission excludes merchant plants and other stations whose fixed costs are not reimbursed through capacity charges from the UI price cap (p18–19), provides an enabling review clause for UI rates (p20–21), clarifies that volume caps will be monitored at State boundaries on an overall basis and that additional UI charge collections stay in the regional pool (p21–23), rejects collective station-wide UI accounting for multi-stage stations (p23–24), confirms that the 105% time-block and 101% daily generation limits are anti-gaming safeguards rather than absolute ceilings (p24–25), and refuses to shorten schedule-revision time blocks (p25–26).
Sections 14–17 cover volume limits and enforcement. The Commission imposes volume caps on over-drawal and, on a parity basis, on under-injection when frequency is below 49.5 Hz, expressed as a percentage of scheduled drawal/injection or an absolute MW limit, whichever is lower, plus a daily aggregate percentage (p26–31). It notes that the phrase limiting the cap to time blocks below 49.5 Hz was inadvertently omitted and that a corrective amendment is being issued (p31–32). It introduces additional UI charges for over-drawal and under-injection below 49.2 Hz, to be computed on the UI ceiling rate or on the UI price cap for capped coal/lignite/APM gas stations, and provides for review of that additional charge (p33–35). RLDCs are directed to publish monthly UI account records separating below-49.2 Hz and 49.5–49.2 Hz deviations (p35). The Commission also declines to exempt entities below 10 MW from the volume cap and confirms that under-generation is treated like over-drawal for low-frequency conditions (p35–37). Non-compliance with RLDC instructions is to be dealt with under the relevant provisions of the Act, including Sections 142 and 149 (p37–38).
Sections 18–19 deal with payment and the UI fund. The regulations specify timelines for payment into and from the UI Pool Account Fund and simple interest for delayed payment; the Commission declines to introduce a payment security mechanism at this stage but flags further deliberation after operational experience (p38–39). The amount left after final settlement may be used for strategic transmission schemes and/or ancillary services including load following, with prior Commission approval and RLDC-identified procedures (p39–45). The Commission anchors this on the Supreme Court's ruling that UI charges are tariff or charges for deviations, not a penalty, and on the Commission's plenary power to regulate the grid (p42–45). The final regulations and pages 46–48 are not included.
Read with this
The regulation
Amendments and corrections
- Dated 3 Jul 2009Corrigendum to the Unscheduled Interchange Charges and Related Matters Regulations, 2009 (3 July 2009)
- Dated 28 Apr 2010Unscheduled Interchange Charges and Related Matters (Amendment) Regulations, 2010
- Dated 28 Jun 2010Corrigendum to the Unscheduled Interchange Charges and Related Matters (Amendment) Regulations, 2010
- Dated 5 Mar 2012Unscheduled Interchange Charges and Related Matters (Second Amendment) Regulations, 2012
Commencement notices and reasons
- Dated 26 Apr 2010Unscheduled Interchange Charges and Related Matters (Amendment) Regulations, 2010 — Order
- Dated 26 May 2010UI Charges Regulations, 2009 — Amendment, 2010 — Statement of Reasons
- Dated 6 Mar 2012Unscheduled Interchange Charges Regulations, 2009 — Second Amendment, 2012 — Statement of Reasons
Other copies of these documents (3)
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.