Unscheduled Interchange Charges and Related Matters Regulations, 2009
Central Electricity Regulatory Commission (Unscheduled Interchange charges and related matters) Regulations, 2009
Regulation · Gazette copyDated 30 Mar 2009Published in the Gazette 30 Mar 2009In force from 1 Apr 2009No. L-1(1)/2009-CERC. dated the 30th March, 2009
Replaced by Deviation Settlement Mechanism and related matters Regulations, 2014
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Unscheduled Interchange Charges and Related Matters Regulations, 2009.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This gazette, published on 30 March 2009 (p1), contains two CERC notifications. The first, No. L-1(1)/2009-CERC (pp10–20), makes the Central Electricity Regulatory Commission (Unscheduled Interchange charges and related matters) Regulations, 2009, in force from 1 April 2009. It defines key terms such as actual drawal/injection, beneficiary, buyer, seller, scheduled generation/drawal and Unscheduled Interchange (pp10–12). Its objective is to maintain grid discipline through UI charges (p12). It applies to generating stations and beneficiaries, and to sellers and buyers in inter-State open access/medium/long-term access (p13). Regulation 5 sets frequency-linked UI rates payable for over-drawal or under-injection and receivable for under-drawal or over-injection, with a cap for coal/lignite/APM-gas stations and a note that rates will be reviewed six-monthly (pp13–14). Regulation 6 deals with declaration, scheduling and gaming, including deviation limits for non-hydro stations and a compensation mechanism for hydro stations (pp14–15). Regulation 7 caps UI volume below 49.5 Hz and imposes an additional UI charge below 49.2 Hz (pp16–17). Regulations 8–11 require compliance with RLDC instructions, create the UI Pool Account Fund, set payment timelines and interest, and allow residual funds to be used for strategic transmission and ancillary services (pp18–20). Regulations 12–13 give the Commission power to relax and amend (p20). The second notification, No. L-1(2)/2009-CERC (p38), makes the Indian Electricity Grid Code (Amendment) Regulations, 2009, also effective 1 April 2009, amending IEGC Chapter 1 clause 1.2 and clause 1.4(v).
Read with this
The regulation
Amendments and corrections
- Dated 3 Jul 2009Corrigendum to the Unscheduled Interchange Charges and Related Matters Regulations, 2009 (3 July 2009)
- Dated 28 Apr 2010Unscheduled Interchange Charges and Related Matters (Amendment) Regulations, 2010
- Dated 28 Jun 2010Corrigendum to the Unscheduled Interchange Charges and Related Matters (Amendment) Regulations, 2010
- Dated 5 Mar 2012Unscheduled Interchange Charges and Related Matters (Second Amendment) Regulations, 2012
Commencement notices and reasons
- Dated 8 Jun 2009Unscheduled Interchange Charges and Related Matters Regulations, 2009 — Statement of Objects and Reasons
- Dated 26 Apr 2010Unscheduled Interchange Charges and Related Matters (Amendment) Regulations, 2010 — Order
- Dated 26 May 2010UI Charges Regulations, 2009 — Amendment, 2010 — Statement of Reasons
- Dated 6 Mar 2012Unscheduled Interchange Charges Regulations, 2009 — Second Amendment, 2012 — Statement of Reasons
Other copies of these documents (2)
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.