CERC · Central Electricity Regulatory Commission

Unscheduled Interchange Charges and Related Matters Regulations, 2009

Central Electricity Regulatory Commission (Unscheduled Interchange charges and related matters) Regulations, 2009

Regulation · Gazette copyDated 30 Mar 2009Published in the Gazette 30 Mar 2009In force from 1 Apr 2009No. L-1(1)/2009-CERC. dated the 30th March, 2009

Replaced by Deviation Settlement Mechanism and related matters Regulations, 2014

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Unscheduled Interchange Charges and Related Matters Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This gazette, published on 30 March 2009 (p1), contains two CERC notifications. The first, No. L-1(1)/2009-CERC (pp10–20), makes the Central Electricity Regulatory Commission (Unscheduled Interchange charges and related matters) Regulations, 2009, in force from 1 April 2009. It defines key terms such as actual drawal/injection, beneficiary, buyer, seller, scheduled generation/drawal and Unscheduled Interchange (pp10–12). Its objective is to maintain grid discipline through UI charges (p12). It applies to generating stations and beneficiaries, and to sellers and buyers in inter-State open access/medium/long-term access (p13). Regulation 5 sets frequency-linked UI rates payable for over-drawal or under-injection and receivable for under-drawal or over-injection, with a cap for coal/lignite/APM-gas stations and a note that rates will be reviewed six-monthly (pp13–14). Regulation 6 deals with declaration, scheduling and gaming, including deviation limits for non-hydro stations and a compensation mechanism for hydro stations (pp14–15). Regulation 7 caps UI volume below 49.5 Hz and imposes an additional UI charge below 49.2 Hz (pp16–17). Regulations 8–11 require compliance with RLDC instructions, create the UI Pool Account Fund, set payment timelines and interest, and allow residual funds to be used for strategic transmission and ancillary services (pp18–20). Regulations 12–13 give the Commission power to relax and amend (p20). The second notification, No. L-1(2)/2009-CERC (p38), makes the Indian Electricity Grid Code (Amendment) Regulations, 2009, also effective 1 April 2009, amending IEGC Chapter 1 clause 1.2 and clause 1.4(v).

Standard name
DSM Regulations, Grid Code
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document