Skip to content

CERC · Central Electricity Regulatory Commission

Unscheduled Interchange Charges Regulations, 2009 — Second Amendment, 2012 — Statement of Reasons

Central Electricity Regulatory Commission (Unscheduled Interchange charges and related matters) (Second Amendment) Regulations, 2012

Statement of reasonsDated 6 Mar 2012No. L-1(1)/2011-CERC dated 6.3.2012

Replaced by Deviation Settlement Mechanism and related matters Regulations, 2014

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Unscheduled Interchange Charges and Related Matters Regulations, 2009 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 45 of 50. Check the regulator's original before you rely on it.

The document is CERC's Statement of Reasons dated 6.3.2012 for the Central Electricity Regulatory Commission (Unscheduled Interchange charges and related matters) (Second Amendment) Regulations, 2012 (p1). It records that CERC published draft amendments to the 2009 UI Regulations on 19.08.2011, invited comments by 10.09.2011, received about 25 stakeholder submissions and held a public hearing on 19.10.2011 (p1–2). The Commission says it finalized the amendment after considering the objections (p2).

Much of the first half responds to legal and economic objections — mainly from UPPCL and MPPTCL — that UI charges are a third part of tariff, violate Section 61(d)/(g) of the Electricity Act, 2003 and should await court decisions; CERC relies on the Supreme Court's 17.8.2007 judgment and the ABT order to hold that UI charges are a commercial grid-discipline mechanism within its plenary powers (p3–13). It also rejects claims of undue NTPC profiteering and explains why UI should not be used as a real-time market (p13–14).

On rate-setting, it describes the use of CERC-regulated coal/lignite and gas/RLNG/liquid fuel station energy charges for August 2010 to January 2011, the median and highest-cost benchmarks, and proposes the UI price vector (p14–16). In view of stakeholder concerns, the Commission decides the maximum UI charge should apply below 49.5 Hz rather than below 49.7 Hz, with additional UI at 20% of the maximum UI charge for overdrawal between 49.7 and 49.5 Hz, and retains a review threat if indiscipline persists (p21–23, p31–33). It decides to retain the 0.02 Hz step size for the UI price vector until CTU installs 0.01 Hz special energy meters and CEA's Meters Regulations are amended, directing CTU/POSOCO to pursue that (p23–25).

The SoR then revises UI cap rates, including the cap for coal/lignite/APM-gas stations, and sets out additional UI charges for overdrawal and under-injection in the 49.7–49.5, 49.5–49.2 and below-49.2 Hz bands (p26–32). It creates fuel-wise UI cap rates for infirm power injection before COD, rejects blending/mixing and actual-variable-cost options, and specifies a hydro cap (p33–43). The final part records ERLDC's proposal on inter-regional UI adjustment and 50:50 sharing of differential UI between regional pools.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Grid operation and grid code

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document