Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and related matters Regulations, 2014

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2014

RegulationDated 6 Jan 2014In force from 17 Feb 2014No.L-1/132/2013/CERC.- dated 6 th January, 2014

Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's principal deviation settlement regulation, notified 6 January 2014 and brought into force on 17 February 2014 (p1). It replaces the Unscheduled Interchange (UI) regime with a frequency-linked commercial mechanism to maintain grid discipline and security for buyers and sellers scheduled through short-term, medium-term or long-term open access in inter-State transmission (p2–3). Regulation 5 creates the core price vector: charges for deviation are payable or receivable on the average frequency of each 15-minute time block, at rates set out in a graded table from 50.05 Hz and above down to below 49.70 Hz (p3–4). The regulation also sets caps for CERC-regulated coal/lignite/APM-gas stations, removes the cap for APM-gas stations from 1 April 2014, allows zero charge for deviations beyond defined volume thresholds, and deals with infirm power (p4–5). Regulation 7 imposes volume limits of 12% of schedule or 150 MW, whichever is lower, and adds additional charges for crossing them, with separate treatment above and below 49.70 Hz and for over-injection at 50.10 Hz and above (p6–10). It also requires regional entities to change the sign of sustained deviation at least once every 12 time blocks (p10). Regulation 6 addresses scheduling and gaming; Regulation 8 requires compliance with RLDC instructions; Regulations 9–11 establish Regional Deviation Pool Account Funds, payment timelines, interest, letter-of-credit requirements and transfer of surplus to the Power Systems Development Fund (p10–13). Regulations 12–14 provide for relaxation, directions, repeal of the 2009 UI regulations and savings for UI accounts (p13). Annexures I and II give the computation methodologies and illustrations (p14–16).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Payment security

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document