CERC · Central Electricity Regulatory Commission
Unscheduled Interchange Charges and Related Matters (Second Amendment) Regulations, 2012
Central Electricity Regulatory Commission (Unscheduled Interchange charges and related matters) (Second Amendment) Regulations, 2012
Amendment · Gazette copyDated 5 Mar 2012Published in the Gazette 6 Mar 2012In force from 2 Apr 2012No. L-1(1)/2011-CERC dated 5th March, 2012
Replaced by Deviation Settlement Mechanism and related matters Regulations, 2014
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Unscheduled Interchange Charges and Related Matters (Second Amendment) Regulations, 2012.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's Second Amendment to its 2009 Unscheduled Interchange (UI) charges and related matters Regulations, issued as Notification No. L-1(1)/2011-CERC dated 5 March 2012 and published in the Gazette of India Extraordinary Part III Section 4 (No. 59) on 6 March 2012 (p1, p11). Made under Section 178 read with Section 79(1)(c) of the Electricity Act, 2003, it substitutes Regulation 5 and Regulation 7 of the Principal Regulations in full, re-notifies Schedule 'A' and comes into force on 2 April 2012 (p11).
The substituted Regulation 5 (pp11–16) states who pays and who receives the UI charge — over-drawal by a buyer/beneficiary and under-injection by a generating station/seller, mirrored by under-drawal and over-injection — and gives the methodology for building the UI Price Vector in 0.02 Hz frequency steps anchored on 50.2 Hz and 49.50 Hz. It caps UI charges for defined situations: coal/lignite/APM-gas stations deviating from scheduled generation, over-injection beyond a station's declared capacity, under-drawal beyond the schedule, and seller injection beyond the schedule/installed-capacity limits. It requires the Commission to review and re-notify the rate schedule every six months, provides for payment of infirm power injected during pre-COD testing at UI rates subject to fuel-wise ceilings, and lays down how inter-regional UI exchanges between asynchronous regions are computed and settled.
The substituted Regulation 7 (pp16–19) replaces the volume limits: over-drawal and under-injection when frequency is 'below 49.80 Hz' are each capped at 12% of the schedule or 150 MW, whichever is lower, per time block and 3% on a daily aggregate, with an Explanation that the limits apply to all intra-State entities of a State and bite at the inter-State boundary. It adds an Additional UI Charge on over-drawal/under-injection when frequency falls below 49.7 Hz, at percentages the Commission specifies in the schedule (and may vary by frequency range and by category), preserves Section 142 action for breach of the limits, and requires RLDCs to publish monthly UI accounts separating the affected frequency bands.
Schedule 'A' (pp19–24) carries the operative numbers: the frequency-versus-UI-rate table, the UI Cap Rates for each capped category, the additional-charge percentages by frequency band, and the fuel-wise cap rates for infirm power. A closing Note (p19) records the gazette particulars of the Principal Regulations and of the first amendment.
Read with this
The regulation
Amendments and corrections
- Dated 3 Jul 2009Corrigendum to the Unscheduled Interchange Charges and Related Matters Regulations, 2009 (3 July 2009)
- Dated 28 Apr 2010Unscheduled Interchange Charges and Related Matters (Amendment) Regulations, 2010
- Dated 28 Jun 2010Corrigendum to the Unscheduled Interchange Charges and Related Matters (Amendment) Regulations, 2010
- Dated 5 Mar 2012Unscheduled Interchange Charges and Related Matters (Second Amendment) Regulations, 2012
Commencement notices and reasons
- Dated 8 Jun 2009Unscheduled Interchange Charges and Related Matters Regulations, 2009 — Statement of Objects and Reasons
- Dated 26 Apr 2010Unscheduled Interchange Charges and Related Matters (Amendment) Regulations, 2010 — Order
- Dated 26 May 2010UI Charges Regulations, 2009 — Amendment, 2010 — Statement of Reasons
- Dated 6 Mar 2012Unscheduled Interchange Charges Regulations, 2009 — Second Amendment, 2012 — Statement of Reasons
Other copies of these documents (2)
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.