Skip to content

CERC · Central Electricity Regulatory Commission

PSDF First Amendment Regulations, 2014 — Explanatory Memorandum

Explanatory Memorandum for the “Draft Central Electricity Regulatory Commission (Power System Development Fund – First Amendment) Regulations, 2014”

Explanatory memorandum to a draftReleased with the notice dated 28 Feb 2014

Draft

The draft has since been finalised as the Power System Development Fund Regulations, 2014.

Explanatory memorandum to the Power System Development Fund Regulations, 2014 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum accompanying the draft Central Electricity Regulatory Commission (Power System Development Fund – First Amendment) Regulations, 2014 (p1). It sets out why the Commission proposes to amend the PSDF Regulations; it does not itself contain the amended text.

Section 1 gives the rationale. It recalls that the Principal PSDF Regulations were notified on 4 June 2010 (p1), and explains CERC's role in regulating interstate transmission of electricity under section 79(1)(c) of the Electricity Act, including grid discipline and the commercial mechanisms built around it (p1). It identifies the four charges that constitute the PSDF — unscheduled interchange charge, congestion charge, market splitting congestion amount, and reactive compensation for failure to maintain voltage — and describes how surpluses left in the accounts kept by the Regional Load Despatch Centres after settlement of claims are pooled into the fund (p1–2).

Section 2 recounts the steps taken to operationalise the fund: parking the PSDF in the Public Account of India, entrusting the National Load Despatch Centre with maintaining and operating it, and the Commission's request to the Ministry of Power to make the necessary changes in the NLDC Rules and to suggest an operational procedure for transferring the fund (p2).

Section 3 records that the Ministry of Power took the matter to the Cabinet, which approved a Scheme to Operationalize PSDF, enclosed as Annexure 1 (p2). Section 4 states the conclusion: in the light of the above, it is proposed to amend the PSDF Regulations (p2).

Primary topics
Power System Development Fund (PSDF)

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document