PSDF First Amendment Regulations, 2014 — Explanatory Memorandum
Explanatory Memorandum for the “Draft Central Electricity Regulatory Commission (Power System Development Fund – First Amendment) Regulations, 2014”
Explanatory memorandum to a draftReleased with the notice dated 28 Feb 2014
Draft
The draft has since been finalised as the Power System Development Fund Regulations, 2014.
Explanatory memorandum to the Power System Development Fund Regulations, 2014 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's explanatory memorandum accompanying the draft Central Electricity Regulatory Commission (Power System Development Fund – First Amendment) Regulations, 2014 (p1). It sets out why the Commission proposes to amend the PSDF Regulations; it does not itself contain the amended text.
Section 1 gives the rationale. It recalls that the Principal PSDF Regulations were notified on 4 June 2010 (p1), and explains CERC's role in regulating interstate transmission of electricity under section 79(1)(c) of the Electricity Act, including grid discipline and the commercial mechanisms built around it (p1). It identifies the four charges that constitute the PSDF — unscheduled interchange charge, congestion charge, market splitting congestion amount, and reactive compensation for failure to maintain voltage — and describes how surpluses left in the accounts kept by the Regional Load Despatch Centres after settlement of claims are pooled into the fund (p1–2).
Section 2 recounts the steps taken to operationalise the fund: parking the PSDF in the Public Account of India, entrusting the National Load Despatch Centre with maintaining and operating it, and the Commission's request to the Ministry of Power to make the necessary changes in the NLDC Rules and to suggest an operational procedure for transferring the fund (p2).
Section 3 records that the Ministry of Power took the matter to the Cabinet, which approved a Scheme to Operationalize PSDF, enclosed as Annexure 1 (p2). Section 4 states the conclusion: in the light of the above, it is proposed to amend the PSDF Regulations (p2).
Read with this
The regulation
- Dated 9 Jun 2014Power System Development Fund Regulations, 2014
Amendments and corrections
Commencement notices and reasons
Other copies of these documents (2)
- Dated 9 Jun 2014Power System Development Fund Regulations, 2014
- Dated 3 Jul 2015Power System Development Fund (First Amendment) Regulations, 2015
Earlier drafts
- Dated 28 Feb 2014Power System Development Fund Regulations, 2014 — Draft
- Dated 10 Jan 2014Explanatory memorandum: Scheme for Operationalization of Power System Development Fund
- Dated 28 Feb 2014Public notice: Draft Power System Development Fund Regulations, 2014 — Public Notice
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.