CERC · Central Electricity Regulatory Commission

Power System Development Fund (First Amendment) Regulations, 2014 — Statement of Reasons

Central Electricity Regulatory Commission (Power System Development Fund) (First Amendment) Regulations, 2014

Statement of reasonsDated 18 Sep 2015

Replaced by Power System Development Fund Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Power System Development Fund Regulations, 2014 or one of its amendments.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, annual reports, confirmation or declaration or any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons, dated 18.9.2015, for inserting a new sub-clause (3A) after clause (3) of Regulation 4 of the Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014 (p1).

Paragraph 1 records that the Ministry of Power sanctioned a scheme for utilisation of gas-based generation capacity by Office Memorandum No. 4/2/2015-Th.I dated 27 March 2015, under which imported spot RLNG ("e-bid RLNG") is supplied to stranded gas-based plants and to plants receiving domestic gas, with PSDF support passed on to the discom through a transparent reverse e-bidding process (p1). Eligibility turns on actual average PLF during April–January 2014-15 falling below the target PLF, and support covers only the incremental PLF above the base PLF and up to the target PLF, with incremental generation as defined by EPMC (p1).

Paragraph 2 sets out the proposed sub-clause, which makes any Central Government scheme in the interest of power system development that requires PSDF support eligible for assistance notwithstanding anything else in the regulations (p1–2). Because no comments were received, the Commission decided to add it as proposed in the final Regulations (p1–2). Nothing on commencement or gazette publication appears; the pages carry only the reasoning, the inserted text and the signatures of the Chairperson and two Members (p2).

Primary topics
Power System Development Fund (PSDF)

Read with this

The regulation

Amendments and corrections

Other copies of these documents (2)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document