Power System Development Fund Regulations, 2014

Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014

Regulation · Gazette copyDated 9 Jun 2014Published in the Gazette 10 Jun 2014No. L-1/148 /2014/CERC dated 9th June, 2014

Replaced by Power System Development Fund Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Power System Development Fund Regulations, 2014.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, annual reports, confirmation or declaration or any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gazette notification (Extraordinary, Part III—Section 4, No. 171, dated 10 June 2014, p1) of the Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014, issued by the Commission on 9 June 2014 under s.178(1) and s.178(2)(ze) of the Electricity Act, 2003 (p6). It replaces the 2010 PSDF regulations and sets up the institutional machinery for a dedicated fund that finances transmission and grid-security projects.

Regulation 3 constitutes the Power System Development Fund and specifies the revenue streams credited to it — congestion charges, congestion amount from market splitting, deviation settlement charges, RLDC reactive energy charges, additional transmission charges from STOA explicit auctions, and any other charges the Commission may notify — and requires them to be held in the Public Account of India (p7–8). Regulation 4 states what the fund may be spent on: transmission systems of strategic importance for relieving congestion, reactive compensation and voltage-profile equipment, special protection schemes and protection-audit remedies, R&M of transmission, and related studies or PMU installation; distribution-utility projects incidental to the inter-state system are eligible only if not covered by other central schemes, and private-sector projects are excluded (p8).

Regulations 5 to 8 create the delivery chain: NLDC as Nodal Agency and secretariat (p8–9); a CEA-chaired Appraisal Committee for techno-economic scrutiny and prioritisation; an inter-ministerial Monitoring Committee chaired by Secretary (Power) that sanctions projects and supervises them, with POSOCO's CEO as Member-Secretary (p9); and the application, screening, appraisal, Commission-vetting and sanction procedure, under which the Commission checks only scope and prioritisation and expressly leaves project cost to the Appropriate Commission at tariff stage (p9). Regulation 9 provides that funding is a grant subject to availability of funds, with detailed guidelines to come from the Monitoring Committee (p9–10).

The remaining regulations cover execution and O&M responsibility of the project entity under the 2014 Tariff Regulations (p10), budget, accounts, utilisation certificates and audit through the Detailed Procedure (p10), identification of implementing agencies and outcome-based monitoring (p10), the Annual Report to the Central Government and Parliament (p10), the Commission's power to remove difficulties by order (p10), and repeal of the 2010 regulations with savings for past actions (p10).

Primary topics
Power System Development Fund (PSDF)

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (1)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document