Skip to content

CERC · Central Electricity Regulatory Commission

Scheme for Operationalization of Power System Development Fund

SCHEME FOR OPERATIONALIZATION OF POWER SYSTEM DEVELOPMENT FUND

Explanatory memorandum to a draftDated 10 Jan 2014No. 29/9/2010-R&R (Vol-II) dated 10th January, 2014

Draft

The draft has since been finalised as the Power System Development Fund Regulations, 2014.

Explanatory memorandum to the Power System Development Fund Regulations, 2014 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Ministry of Power circular dated 10 January 2014, No. 29/9/2010-R&R (Vol-II), transmitting the Scheme for Operationalization of the Power System Development Fund that the Cabinet approved on 2 January 2014 (p1). The covering letter lists the five purposes PSDF money may be put to and names the National Load Despatch Centre as nodal agency, and asks recipients for an immediate action-taken report (pp1–2).

The Scheme proper (pp3–10) explains that PSDF collects the surplus remaining after settlement of four commercial grid-discipline charges — unscheduled interchange, congestion, market-splitting congestion amount and reactive energy charges — and is to be used under the CERC (PSDF) Regulations, 2010, as amended (pp3–4). It confirms NLDC as nodal agency (p4), sets out the categories of eligible projects — strategic transmission works, reactive compensation, protection schemes and R&M, plus technical studies and capacity building — and restricts assistance to projects not covered by other Government of India schemes, excluding private sector projects (pp4–5).

It creates an Appraisal Committee for techno-economic appraisal and prioritisation, and an Inter-Ministerial Monitoring Committee under Secretary (Power) for sanction and monitoring, with compositions at Annexures I and II (p5, pp9–10). Sections 5–10 set the workflow: DPRs to NLDC, appraisal with CEA support, appraisal report to the Appropriate Commission, a petition for regulatory approval with no tariff claim on the PSDF-funded portion, then administrative sanction and release through the Ministry of Power budget — alongside grant-based assistance, execution and O&M responsibility, budget and audit arrangements, implementing agencies with quarterly monitoring, and an annual report to be laid before Parliament (pp6–9).

Primary topics
Power System Development Fund (PSDF)

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document