CERC · Central Electricity Regulatory Commission
Scheme for Operationalization of Power System Development Fund
SCHEME FOR OPERATIONALIZATION OF POWER SYSTEM DEVELOPMENT FUND
Explanatory memorandum to a draftDated 10 Jan 2014No. 29/9/2010-R&R (Vol-II) dated 10th January, 2014
Draft
The draft has since been finalised as the Power System Development Fund Regulations, 2014.
Explanatory memorandum to the Power System Development Fund Regulations, 2014 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Ministry of Power circular dated 10 January 2014, No. 29/9/2010-R&R (Vol-II), transmitting the Scheme for Operationalization of the Power System Development Fund that the Cabinet approved on 2 January 2014 (p1). The covering letter lists the five purposes PSDF money may be put to and names the National Load Despatch Centre as nodal agency, and asks recipients for an immediate action-taken report (pp1–2).
The Scheme proper (pp3–10) explains that PSDF collects the surplus remaining after settlement of four commercial grid-discipline charges — unscheduled interchange, congestion, market-splitting congestion amount and reactive energy charges — and is to be used under the CERC (PSDF) Regulations, 2010, as amended (pp3–4). It confirms NLDC as nodal agency (p4), sets out the categories of eligible projects — strategic transmission works, reactive compensation, protection schemes and R&M, plus technical studies and capacity building — and restricts assistance to projects not covered by other Government of India schemes, excluding private sector projects (pp4–5).
It creates an Appraisal Committee for techno-economic appraisal and prioritisation, and an Inter-Ministerial Monitoring Committee under Secretary (Power) for sanction and monitoring, with compositions at Annexures I and II (p5, pp9–10). Sections 5–10 set the workflow: DPRs to NLDC, appraisal with CEA support, appraisal report to the Appropriate Commission, a petition for regulatory approval with no tariff claim on the PSDF-funded portion, then administrative sanction and release through the Ministry of Power budget — alongside grant-based assistance, execution and O&M responsibility, budget and audit arrangements, implementing agencies with quarterly monitoring, and an annual report to be laid before Parliament (pp6–9).
Read with this
The regulation
- Dated 9 Jun 2014Power System Development Fund Regulations, 2014
Amendments and corrections
Commencement notices and reasons
Other copies of these documents (2)
- Dated 9 Jun 2014Power System Development Fund Regulations, 2014
- Dated 3 Jul 2015Power System Development Fund (First Amendment) Regulations, 2015
Earlier drafts
- Dated 28 Feb 2014Power System Development Fund Regulations, 2014 — Draft
- Released with the notice dated 28 Feb 2014Explanatory memorandum: PSDF First Amendment Regulations, 2014 — Explanatory Memorandum
- Dated 28 Feb 2014Public notice: Draft Power System Development Fund Regulations, 2014 — Public Notice
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.