CERC · Central Electricity Regulatory Commission
Introduction of Ancillary Services in India — Explanatory Memorandum
EXPLANATORY MEMORANDUM ON INTRODUCTION OF ANCILLARY SERVICES IN INDIA
Explanatory memorandum to a draftReleased with the notice dated 1 May 2015
Draft
The draft has since been finalised as the Ancillary Services Operations Regulations, 2015.
Explanatory memorandum to the draft Ancillary Services Operations Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's explanatory memorandum setting out why and how ancillary services should be introduced in the Indian inter-state grid, and it doubles as the design note for the proposed Reserves Regulation Ancillary Services (RRAS) framework.
Part I (pp1–3) explains what ancillary services are — frequency control, network control (voltage and power flow) and system restart/black start — records that black start is presently a mandatory service, and traces the mandate to the National Electricity Policy (reserve capacity margin), the CERC Power Market Regulations 2010 (which define ancillary services and defer the ancillary services market to a later date) and the IEGC objective clause. It then lists the stakeholder trail from the November 2010 NLDC petition through CERC staff work, and points to the December 2013 synchronous interconnection of the NEW and SR grids and to renewable integration as reasons to move now.
Part II (pp4–7) is a technical account of frequency control: primary (governor) response and the restricted governor mode obligation on large plants, secondary control through AGC — described as absent by design in India, with a roadmap said to be needed — and tertiary control, including the proposal to use un-requisitioned surplus of inter-state stations and Table 1 on reserves typically available.
Part III (pp8–12) is the operative proposal: NLDC through RLDCs as nodal agency at inter-state level and SLDCs intra-state; eligibility of providers; merit-order stacking of un-requisitioned surplus by variable cost, declared capacity and region/bid area; contingency triggers for kick-in and the withdrawal procedure; weekly energy accounting by RPCs with an ancillary services statement alongside the DSM statement; settlement by RLDCs through a separate head in the regional DSM pool; and the commercial mechanism, including payment of fixed and variable charges with a markup fixed by separate Commission order, refund of fixed charges to original beneficiaries, and payment of variable charges to the pool on regulation down. No commitment charges are paid for availability. The detailed procedure is left to the nodal agency with the Commission's prior approval.
Annexure I (pp13–14) is a flowchart; Annexure II (pp15–19) is a mock Northern Region study of 16–22 June 2014 quantifying frequency, DSM and cost effects of kicking in un-requisitioned gas capacity.
Read with this
The regulation
- Dated 13 Aug 2015Ancillary Services Operations Regulations, 2015
Commencement notices and reasons
Procedures and orders made under it
- Dated 21 Nov 2016Ancillary Services Operations — Detailed Procedure
- Dated 8 Dec 2016Corrigendum to Final Detailed Procedure for Ancillary Services Operations, 2016
- Date not statedDetailed Procedure for Ancillary Services Operations, 2016
Other copies of these documents (1)
- Dated 13 Aug 2015Ancillary Services Operations Regulations, 2015
Earlier drafts
- Dated 1 May 2015Ancillary Services Operations Regulations, 2015
- Dated 1 May 2015Public notice: Ancillary Services Operations Regulations, 2015 — Public Notice — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.