CERC · Central Electricity Regulatory Commission
Ancillary Services Operations Regulations, 2015 — Statement of Reasons
Framework on Ancillary Services Operations Regulations 2015: Statement of Reasons
Statement of reasonsDated 17 Sep 2015
Replaced by Ancillary Services Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Ancillary Services Operations Regulations, 2015.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”
Summary
Summary written by software, from pages 1 to 28 of 38. Check the regulator's original before you rely on it.
This is CERC's Statement of Reasons (SoR) dated 17 September 2015, issued alongside the final Central Electricity Regulatory Commission (Ancillary Services Operations) Regulations, 2015. It records the consultation: the draft was notified by public notice No. 18/1/2013 on 1 May 2015, comments were received to 1 June 2015, and a public hearing was held on 12 June 2015 with eight oral presentations; Annexure I lists the commenters (p1). Every section follows the same template — the draft clause, the comments received, and the Commission's analysis and decision, closing with amended clause text.
Section 1 settles definitions and scope. The framework is deliberately limited to tertiary frequency control delivered as Reserves Regulation Ancillary Services (Regulation Up and Regulation Down) using un-requisitioned surplus; proposals to add voltage control, black start, primary/secondary reserves, storage, demand response and smart-grid services are noted but deferred, and the definition of RRAS Provider plus an incentive route for Regulation Down are changed (p1–5).
Section 2 fixes applicability and eligibility: only generating stations that are regional entities with tariff determined or adopted by the Commission for their full capacity, with renewables, DISCOMs, traders, CPPs, merchant plants and UMPPs to be considered later. On the voluntary-versus-mandatory question, the Commission holds that once a generator has no contract for off-take the system operator may use the capacity, and that Regulation Down instructions must be complied with (p5–11).
Section 3 gives the nodal agency's role — merit-order stacking, dispatch triggers, monitoring, withdrawal — and the merit-order principles: separate up and down stacks based on variable cost, with ramp rate, response time and transmission constraints to be added in the Detailed Procedure (p11–16). Section 4 assigns RPCs a monthly information and weekly accounting role (p16–17).
Section 5 covers dispatch and withdrawal, priority of the original procurer to recall un-requisitioned power, and inter-regional deployment (p17–20). Section 6 covers scheduling, replacing the draft's "pseudo-entity pool" with a newly defined "Virtual Ancillary Entity" in the regional DSM pool, and delivery ex-bus (p20–22).
Section 7 covers energy accounting and commercial settlement: weekly accounting by RPCs, payment out of the Regional Deviation Pool with cross-regional make-up of deficits, mark-up confined to fixed cost and set by separate order, a pay-back obligation for Regulation Down, penalties for gaming, no commitment charges, and no retrospective settlement of revised charges (p22–28).
Read with this
The regulation
- Dated 13 Aug 2015Ancillary Services Operations Regulations, 2015
Procedures and orders made under it
- Dated 21 Nov 2016Ancillary Services Operations — Detailed Procedure
- Dated 8 Dec 2016Corrigendum to Final Detailed Procedure for Ancillary Services Operations, 2016
- Date not statedDetailed Procedure for Ancillary Services Operations, 2016
Other copies of these documents (1)
- Dated 13 Aug 2015Ancillary Services Operations Regulations, 2015
Earlier drafts
- Dated 1 May 2015Ancillary Services Operations Regulations, 2015
- Released with the notice dated 1 May 2015Explanatory memorandum: Introduction of Ancillary Services in India — Explanatory Memorandum
- Dated 1 May 2015Public notice: Ancillary Services Operations Regulations, 2015 — Public Notice — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.