CERC · Central Electricity Regulatory Commission
Ancillary Services Operations Regulations, 2015
Central Electricity Regulatory Commission (Ancillary Services Operations) Regulations, 2015
Draft regulationDated 1 May 2015
Draft
A proposal that has since been finalised as the Ancillary Services Operations Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Central Electricity Regulatory Commission's notification making the CERC (Ancillary Services Operations) Regulations, 2015, issued from New Delhi on 1 May 2015 under s.178 of the Electricity Act, 2003 (p1). It creates a framework for Reserves Regulation Ancillary Services (RRAS) — a mechanism to use un-requisitioned surplus generation from inter-State generating stations to correct system frequency and relieve transmission congestion (p2–3).
Regulation 2 defines the working vocabulary: deviation, congestion, time-block, interface meters, Nodal Agency, and the two services, Regulation Up (increase generation) and Regulation Down (decrease generation) (p1–2). Regulation 3 states the objective and Regulation 4 confines application to RRAS providers and regional entities transacting through short-, medium- or long-term open access in inter-State transmission (p2–3). Regulation 5 sets eligibility: ISGSs whose tariff is determined or adopted by the Commission, operating on part load and not fully requisitioned (p3).
Regulations 6 to 8 allocate roles: the Nodal Agency (NLDC through the RLDCs) builds a merit-order stack of un-requisitioned surplus by variable cost, monitors frequency and directs despatch on listed trigger events (p3); the provider submits cost details monthly and injects or backs down on instruction (p3–4); the Regional Power Committees pass cost details to the Nodal Agency and use them for energy and deviation accounts (p4).
Regulations 9 to 13 cover the mechanics: despatch to the Regional Deviation Pool, deemed triggering, revision of schedules, treatment of deviations under the DSM Regulations 2014, withdrawal, scheduling through the pseudo-entity 'pool', weekly energy accounting by RPCs, and settlement under a separate RRAS head in the Deviation Settlement Account, paid from the Regional Deviation Pool Account Fund at fixed and variable charges with a mark-up set by separate Commission order (p4–6). Regulation 14 requires a detailed procedure to be issued by the Nodal Agency with the Commission's prior approval; Regulations 15 and 16 give the Commission power to relax provisions and to issue directions (p6).
Read with this
The regulation
- Dated 13 Aug 2015Ancillary Services Operations Regulations, 2015
Commencement notices and reasons
Procedures and orders made under it
- Dated 21 Nov 2016Ancillary Services Operations — Detailed Procedure
- Dated 8 Dec 2016Corrigendum to Final Detailed Procedure for Ancillary Services Operations, 2016
- Date not statedDetailed Procedure for Ancillary Services Operations, 2016
Other copies of these documents (1)
- Dated 13 Aug 2015Ancillary Services Operations Regulations, 2015
Earlier drafts
- Released with the notice dated 1 May 2015Explanatory memorandum: Introduction of Ancillary Services in India — Explanatory Memorandum
- Dated 1 May 2015Public notice: Ancillary Services Operations Regulations, 2015 — Public Notice — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.