Skip to content

CERC · Central Electricity Regulatory Commission

Ancillary Services Operations Regulations, 2015

Central Electricity Regulatory Commission (Ancillary Services Operations) Regulations, 2015

Draft regulationDated 1 May 2015

Draft

A proposal that has since been finalised as the Ancillary Services Operations Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's notification making the CERC (Ancillary Services Operations) Regulations, 2015, issued from New Delhi on 1 May 2015 under s.178 of the Electricity Act, 2003 (p1). It creates a framework for Reserves Regulation Ancillary Services (RRAS) — a mechanism to use un-requisitioned surplus generation from inter-State generating stations to correct system frequency and relieve transmission congestion (p2–3).

Regulation 2 defines the working vocabulary: deviation, congestion, time-block, interface meters, Nodal Agency, and the two services, Regulation Up (increase generation) and Regulation Down (decrease generation) (p1–2). Regulation 3 states the objective and Regulation 4 confines application to RRAS providers and regional entities transacting through short-, medium- or long-term open access in inter-State transmission (p2–3). Regulation 5 sets eligibility: ISGSs whose tariff is determined or adopted by the Commission, operating on part load and not fully requisitioned (p3).

Regulations 6 to 8 allocate roles: the Nodal Agency (NLDC through the RLDCs) builds a merit-order stack of un-requisitioned surplus by variable cost, monitors frequency and directs despatch on listed trigger events (p3); the provider submits cost details monthly and injects or backs down on instruction (p3–4); the Regional Power Committees pass cost details to the Nodal Agency and use them for energy and deviation accounts (p4).

Regulations 9 to 13 cover the mechanics: despatch to the Regional Deviation Pool, deemed triggering, revision of schedules, treatment of deviations under the DSM Regulations 2014, withdrawal, scheduling through the pseudo-entity 'pool', weekly energy accounting by RPCs, and settlement under a separate RRAS head in the Deviation Settlement Account, paid from the Regional Deviation Pool Account Fund at fixed and variable charges with a mark-up set by separate Commission order (p4–6). Regulation 14 requires a detailed procedure to be issued by the Nodal Agency with the Commission's prior approval; Regulations 15 and 16 give the Commission power to relax provisions and to issue directions (p6).

Standard name
Ancillary Services Regulations
Primary topics
Ancillary services and reserves, Scheduling and despatch, Energy accounting and settlement

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (1)

Earlier drafts

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document