CERC · Central Electricity Regulatory Commission
Ancillary Services Operations Regulations, 2015
Central Electricity Regulatory Commission (Ancillary Services Operations) Regulations, 2015
RegulationDated 13 Aug 2015No. 18/1/2013/Reg.Aff.(AS Regul.)/CERC. dated 13 th August, 2015
Replaced by Ancillary Services Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's principal framework for Reserves Regulation Ancillary Services (RRAS) — a mechanism by which the system operator instructs eligible inter-State generating stations to increase (Regulation Up) or back down (Regulation Down) generation to correct frequency and relieve transmission congestion (p1, p3). It is a notification of 13 August 2015, issued under section 178 of the Electricity Act, 2003, and it expressly does not commence on that date: regulation 1.2 leaves entry into force to a date the Commission is yet to notify (p1).
Regulations 2–4 set definitions, state the objective — restoring frequency to the desired level and relieving network congestion — and fix scope on regional entities transacting through short-term, medium-term or long-term open access in inter-State transmission (pp1–3). Regulation 5 makes RRAS mandatory for all generating stations that are regional entities and whose tariff the Commission determines or adopts for their full capacity (p3).
Regulation 6 assigns the operational role to the Nodal Agency (NLDC through the RLDCs; SLDC intra-State once SERCs introduce the service): it builds merit-order stacks of un-requisitioned surplus — lowest-to-highest variable cost for Regulation Up, the reverse for Regulation Down — subject to ramp rate, response time and transmission constraints, and triggers despatch on listed system events (pp2–4). Regulations 7–8 cover the RRAS Provider's monthly reporting of fixed, variable and statutory charges and the Regional Power Committees' role in passing those charges to the Nodal Agency and in preparing deviation accounts (p4).
Regulations 9–11 govern dispatch, withdrawal and scheduling: RRAS is scheduled to a Virtual Ancillary Entity, the provider's schedule is deemed revised, and deviations beyond the revised schedule fall back to the Deviation Settlement Mechanism Regulations, 2014 (pp4–5). Regulations 12–13 set weekly energy accounting by the RPCs, an Ancillary Services Statement alongside the DSM account, settlement through a separate head of the Regional Deviation Pool Account Fund, payment at fixed and variable charges with a markup on fixed cost as the Commission decides by separate order, and adjustment of fixed charges to original beneficiaries (pp5–6). Regulation 14 requires the Nodal Agency to issue a Detailed Procedure within three months with prior Commission approval, carrying the operational detail — scheduling, dispatch, withdrawal timeframes and residual matters (p6). Regulations 15–16 preserve the Commission's powers to relax provisions and to issue directions to remove difficulties (pp6–7).
Read with this
Commencement notices and reasons
Procedures and orders made under it
- Dated 21 Nov 2016Ancillary Services Operations — Detailed Procedure
- Dated 8 Dec 2016Corrigendum to Final Detailed Procedure for Ancillary Services Operations, 2016
- Date not statedDetailed Procedure for Ancillary Services Operations, 2016
Other copies of these documents (1)
- Dated 13 Aug 2015Ancillary Services Operations Regulations, 2015
Earlier drafts
- Dated 1 May 2015Ancillary Services Operations Regulations, 2015
- Released with the notice dated 1 May 2015Explanatory memorandum: Introduction of Ancillary Services in India — Explanatory Memorandum
- Dated 1 May 2015Public notice: Ancillary Services Operations Regulations, 2015 — Public Notice — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.