UERC · Uttarakhand Electricity Regulatory Commission
Renewable Energy Tariff (Fifth Amendment) Regulations, 2016 — Statement of Reasons
Statement of Reasons for the "UERC (Tariff and other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Fifth Amendment) Regulations, 2016"
Statement of reasonsDate not stated
Replaced by RE and Non-fossil Fuel Co-generation Tariff Regulations, 2018
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations Regulations, 2013 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's Statement of Reasons — the explanatory record accompanying the Fifth Amendment to UERC's 2013 renewable-energy tariff regulations. It is not the amendment itself: only the reasoning, the stakeholder objections and the Commission's decisions are set out, so a reader uses it to understand what the Fifth Amendment was intended to do and why the final version departs from the draft (p1–2).
Pages 1–2 give the background: the Principal Regulations of 2013, four earlier amendments, the draft fifth amendment issued for public comment (last date 14.03.2016) and a hearing on 05.04.2016 (p1). Annexure-I and Annexure-II, the lists of commenters and hearing participants, are referenced but not reproduced here (p1).
Paragraphs 1–10 then take each proposed change in turn:
- Regulation 2 (scope) — bringing canal bank and canal top solar PV and MSW/RDF projects within the regulations; continuing present tariffs for stations commissioned before the regulations came into effect while applying the fuel-cost/variable-charge provisions and the solar levelised adder to them; and making the generic solar tariff a ceiling under competitive bidding, with a margin over the L-1 bid allowed for canal plants built by eligible government organisations under the MNRE scheme (p2–4). - Regulation 3 (definitions) — inter-connection point, municipal solid waste, refuse derived fuel, canal bank and canal top solar PV plants, and tariff periods for the new technologies (p5–6). - Regulation 4 (eligibility) — canal solar on MNRE-approved technologies; MSW and RDF projects using new plant and machinery on Rankine cycle. Requests to admit UHTH technology were refused because MNRE has not approved it, and Regulation 4(3) makes MNRE approval the gateway for any new technology (p6–8). - Regulations 11 and 19 — annual review of benchmark capital cost for the new categories, and inclusion of canal solar and MSW/RDF in working-capital interest (p8–9). - New Regulation 33(A) — canal bank and canal top solar PV, with benchmark capital cost specified separately for the two categories after canvassing MNRE subsidy levels and state bidding results (p9–12). - New Regulation 36(A) — MSW/RDF projects: capital cost, plant load factor, auxiliary consumption, station heat rate and calorific value; no fuel cost for MSW; RDF fuel-price indexation formula; an option between indexed and normative escalation; and the variable-charge formula. The Commission revised these norms from the draft to follow CERC after UREDA's suggestions (p12–16). - Forms 2.1 and 2.2 and Annexure-1 — template amendments and new levellised fixed-charge (and RDF variable-charge) entries for MSW, RDF and canal bank/canal top solar (p16–19).
Read with this
The regulation
Amendments and corrections
- Dated 15 Oct 2013Renewable Energy and Non-Fossil Co-generation Tariff Regulations, 2013 — First Amendment, 2013
- Dated 20 Jun 2014RE Tariff (Second Amendment) Regulations, 2014 (amending the 2010 Regulations)
- Dated 21 Jul 2015RE Tariff Regulations, 2013 — Third Amendment, 2015
- Dated 9 Sep 2015RE Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations, 2013 — Fourth Amendment, 2015
- Dated 29 Apr 2016Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and Non-Fossil Fuel Based Co-generating Stations (Fifth Amendment) Regulations, 2016
- Dated 8 Sep 2017Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and Non-Fossil Co-generating Stations (Sixth Amendment) Regulations, 2017
Commencement notices and reasons
- Date not statedRE Tariff Regulations, 2013 — Sixth Amendment, 2017 & RE Tariff Regulations, 2010 — Third Amendment, 2017 — Statement of Reasons
- Date not statedRE Tariff Regulations, 2013 — Third Amendment, 2015 — Statement of Reasons
- Date not statedRE Tariff Regulations, 2013 — Fourth Amendment, 2015 — Statement of Reasons
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.