Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

RE Tariff Regulations, 2013 — Third Amendment, 2015 — Statement of Reasons

Statement of Reasons for the "UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Third Amendment) Regulations, 2015".

Statement of reasonsDate not stated

Replaced by RE and Non-fossil Fuel Co-generation Tariff Regulations, 2018

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations Regulations, 2013 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Uttarakhand Electricity Regulatory Commission's Statement of Reasons (SoR) for the third amendment to its 2013 RE tariff regulations, which govern tariffs and other terms for supply of electricity from renewable sources and non-fossil-fuel co-generating stations (p1). It records the comments received on the draft amendment published on 13.05.2015 — itself triggered by the ATE's judgment in Appeal No. 31 of 2015 — and the Commission's reasoning and final decisions, issue by issue. There is no gazette date or in-force date in the text; the closing paragraph merely says the Commission has decided to issue the amendment regulations (p15).

The SoR works through six heads. It fixes the meaning of "billing cycle or billing period" as monthly for eligible rooftop/small-solar consumers, rejecting UPCL's proposal of quarterly payments (pp2–3); narrows the definition of "premises" to land/buildings/infrastructure owned by the eligible consumer, refusing both UREDA's request to include surrounding wasteland and UPCL's request to align with the Supply Code (pp3–5); and confirms the proviso to Regulation 7 allowing a third-party plant owner to sell net energy to the licensee under a tripartite agreement with the consumer (pp5–7).

The largest part concerns Regulation 35 (pp7–12): the draft's ceiling on plant capacity as a share of sanctioned load is removed in favour of an absolute capacity cap linked to the MNRE scheme, net-energy settlement is capped at a share of actual generation with the excess paid at the lowest base slab of the consumer's rate schedule, and eligible consumers are exempted from monthly minimum charges and from open access charges including surcharge for captive use. Regulation 42 is then recast (pp12–14) to set connectivity voltage levels by load, metering and dispute-resolution arrangements, responsibility for safety, back-feeding liability, and licensee-borne cost of check meters. The final section rejects UREDA's request to raise solar RPO targets during the existing five-year control period (pp14–15). Annexures list the stakeholders who commented and the participants in the hearing (pp16–17).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Net metering, Open access charges

Read with this

7 more documents belong here and are not on Voltaic: 7 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document