Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and Non-Fossil Co-generating Stations (Sixth Amendment) Regulations, 2017

UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Sixth Amendment) Regulations, 2017

AmendmentDated 8 Sep 2017No. F-9(21)(VI)/RG/UERC/2017/991 dated September 08, 2017

Replaced by RE and Non-fossil Fuel Co-generation Tariff Regulations, 2018

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations Regulations, 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Sixth Amendment to Uttarakhand's 2013 renewable-energy tariff regulations, notified by UERC on 8 September 2017 under s.181(2)(zp) read with s.86(1)(e) of the Electricity Act, 2003 (p1). It takes effect from the date of the notification and is stated to remain in force for five years from commencement of the Principal Regulations, with a proviso keeping Regulation 9(1) of those Principal Regulations alive until 31.03.2019 (p1).

Clause 2 inserts a formal definition of Performance Ratio, with a formula, into the Principal Regulations (p1). Clause 3 rewrites the definition of date of commercial operation / commissioning: the general test is a successful trial run at maximum continuous rating, small hydro plants instead demonstrate that within three years, and solar PV plants take CoD as the date of first injection into the licensee's grid after three named pre-requisites are met, with a minimum Performance Ratio to be demonstrated at the initial commissioning inspection (p1–2).

Clause 4 replaces Regulation 9(1), the Renewable Purchase Obligation provision — restating who is an obligated entity, revising the solar and non-solar RPO trajectory for FY2013-14 through FY2018-19, defining the energy base against which RPO is measured for discoms as against open-access and captive consumers, excluding hydro-sourced consumption for FY2017-18 and FY2018-19, allowing excess FY2017-18 obligation of open-access and captive users to be carried into FY2018-19, and giving a route to the Commission for procurement above the specified RPO (p2).

Clause 5 replaces Regulation 28 with the technology-specific parameters for small hydro generic tariffs — capital cost, O&M, capacity utilisation factor and auxiliary consumption, banded by project size — plus a note on how CUF and home-state free power are treated (p3). Clause 6 rewrites Regulation 35(3)–(4) on rooftop solar: settlement of injection on a net-energy basis each billing period, a ceiling on net energy relative to actual generation, payment for the excess at the lower of a defined slab rate or a bid-discovered rate, application of the ordinary consumer tariff where licensee supply exceeds injection, exemption from monthly minimum charges, and no open access charges for captive use (p3). Page 4 supplies the fixed-charge tariff schedule for small hydro up to 25 MW effective 01.10.2017, levellised over 35 years and year-by-year, gross and net of accelerated depreciation, by size band.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Renewable purchase obligation (RPO / RCO), Net metering

Read with this

7 more documents belong here and are not on Voltaic: 7 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document