UERC · Uttarakhand Electricity Regulatory Commission
RE Tariff Regulations, 2013 — Third Amendment, 2015
Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Third Amendment) Regulations, 2015
AmendmentDated 21 Jul 2015No. F-9(21)/RG/UERC/2013/689 dated July 21, 2015
Replaced by RE and Non-fossil Fuel Co-generation Tariff Regulations, 2018
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Third Amendment to UERC's 2013 principal regulations on tariffs and other terms for supply of electricity from renewable energy sources and non-fossil-fuel based co-generating stations, issued as Notification No. F-9(21)/RG/UERC/2013/689 dated July 21, 2015 (p1). It comes into force on the date of publication in the official Gazette; the Gazette date itself is not printed (p1). Its focus is rooftop and small solar PV: it fills in the definitions and the net-metering settlement architecture that the principal regulations lacked.
Clause 2 inserts four definitions into Regulation 3 of the principal regulations: billing cycle/billing period (one month), Eligible Consumer (a consumer with a rooftop or small solar system offsetting part or all of its requirement), Premises (land, building, infrastructure or rooftops/elevated areas owned by the Eligible Consumer), and Third party owner (a developer generating solar on the consumer's premises under a lease or commercial agreement) (p1–2).
Clause 3 adds a proviso to Regulation 7 requiring a tripartite agreement among the third party, the Eligible Consumer and the distribution licensee where a third party sells net energy to the licensee (p2).
Clause 4 rewrites sub-regulations (2) to (5) of Regulation 35, setting the capacity ceiling for rooftop and small solar plants at a premises, net energy settlement at the end of each billing period, a cap on net energy relative to actual generation with the excess paid at the lowest base slab of the consumer's rate schedule, application of the ordinary supply tariff where the licensee supplies more than is injected, exemption from monthly minimum charges and open access charges for captive use, and payment at generic tariff where injection exceeds supply (p2–3).
Clause 5 substitutes Regulation 42 in full, giving connectivity voltage levels by load size, a reference of connectivity disputes to the Commission, metering options and cost allocation, applicability of CEA safety regulations, and operation/maintenance and back-feeding liability to the consumer (p3–4).
Read with this
The regulation
Amendments and corrections
- Dated 15 Oct 2013Renewable Energy and Non-Fossil Co-generation Tariff Regulations, 2013 — First Amendment, 2013
- Dated 20 Jun 2014RE Tariff (Second Amendment) Regulations, 2014 (amending the 2010 Regulations)
- Dated 9 Sep 2015RE Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations, 2013 — Fourth Amendment, 2015
- Dated 29 Apr 2016Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and Non-Fossil Fuel Based Co-generating Stations (Fifth Amendment) Regulations, 2016
- Dated 8 Sep 2017Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and Non-Fossil Co-generating Stations (Sixth Amendment) Regulations, 2017
Commencement notices and reasons
- Date not statedRenewable Energy Tariff (Fifth Amendment) Regulations, 2016 — Statement of Reasons
- Date not statedRE Tariff Regulations, 2013 — Sixth Amendment, 2017 & RE Tariff Regulations, 2010 — Third Amendment, 2017 — Statement of Reasons
- Date not statedRE Tariff Regulations, 2013 — Third Amendment, 2015 — Statement of Reasons
- Date not statedRE Tariff Regulations, 2013 — Fourth Amendment, 2015 — Statement of Reasons
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.