HPERC · Himachal Pradesh Electricity Regulatory Commission
Grant of Connectivity and intra-State Open Access (Third Amendment) Regulations, 2024 — finalisation order
Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long–term and Medium-term intra-State Open Access and Related Matters) (Third Amendment) Regulations, 2024.
OrderDated 14 Feb 2024
Made under the Grant of Connectivity and Long-term and Medium-term Intra-State Open Access Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a three-page order of the Himachal Pradesh Electricity Regulatory Commission, dated 14.02.2024, closing out the public consultation on the draft Third Amendment to its 2010 regulations on grant of connectivity and long-term/medium-term intra-State open access, and directing that the amendment be finalised and notified (p1, p3).
The order first sets out the lineage — the principal Regulations notified in the Rajpatra on 3 June 2010 and amended twice, on 10.12.2012 and 16.08.2021 — and states the purpose of the third round: to give impetus to smaller renewable capacity, particularly solar PV, installed in distributed generation mode. It then records compliance with the statutory pre-publication procedure: a public notice in two newspapers on 16.12.2023, the draft hosted on the Commission's website, a closing date for objections of 15.01.2024, and letters to major stakeholders on 19.12.2023 (p1).
Three stakeholders responded (p2). HPPTCL and HPSLDC had no objection. HPSEBL, the distribution licensee, objected to exempting the connectivity fee for solar PV and biomass projects up to 1 MW — arguing the feasibility study uses its own distribution system — and asked that the fee instead be passed through in the Multi Year Tariff and that CAPEX for network up-gradation be released in advance.
The Commission declined that objection (p2–3). It reasoned that small solar projects need relief on more than the application fee, extending the exemption to the registration fee charged by the authorised agency; that connectivity-fee recovery is non-tariff income already accounted for in tariff orders; and that evacuation-related network up-gradation belongs in the licensee's business plan CAPEX. It also noted these small generators selling to HPSEBL help the licensee meet its distributed renewable energy obligations. It decided to retain the draft provision in the final amendment.
Separately, the Commission found the 120-day processing period for long-term open access cases needing no augmentation too long and decided to reduce it to 60 days (p3). The order ends by directing that the Third Amendment Regulations, 2024 be finalised and notified with these changes. It does not reproduce the amended regulation text and prints no Gazette publication date.
Read with this
The regulation
Amendments and corrections
- Dated 7 Dec 2012Grant of Connectivity, Long-term and Medium-term intra-State Open Access and Related Matters Regulations, 2010 — First Amendment, 2012
- Dated 11 Aug 2021Grant of Connectivity and Long-term/Medium-term intra-State Open Access Regulations, 2010 — Second Amendment, 2021
- Dated 15 Feb 2024Grant of Connectivity, Long-term and Medium-term intra-State Open Access and Related Matters Regulations, 2010 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.