Grant of Connectivity and Long-term/Medium-term intra-State Open Access Regulations, 2010 — Second Amendment, 2021
Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium–term intra-State Open Access and Related Matters) (Second Amendment) Regulations, 2021
AmendmentDated 11 Aug 2021No. HPERC/418 dated 11th August, 2021
Amends the Grant of Connectivity and Long-term and Medium-term Intra-State Open Access Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a 14-clause amending regulation issued by HPERC on 11 August 2021, reworking the Commission's 2010 framework for granting connectivity and long-term and medium-term intra-State open access, as already amended once in 2012. It takes effect from publication in the Himachal Pradesh Rajpatra, a date the text does not print (p1).
Clauses 2 to 5 touch the front end of the process. Regulation 2's definitions are revised — the word "bulk" dropped from "connectivity", a new "State Grid" definition inserted, "intra-State entity" re-anchored to the 2018 Deviation Settlement Mechanism (DSM) Regulations, and the medium-term open access and time-block definitions altered (p1–2). Applications must now be filed online with an automatically generated acknowledgement, and a new regulation 5A sets out how the nodal agency processes them: month-end cut-off, deficiency intimation, rectification windows, closure, partial forfeiture of fees and refunds (p2–3). Regulation 6's fee table is replaced wholesale, with slabs keyed to the quantum of power injected into or drawn from the State Grid (p3).
The bulk of the document is clause 6, rewriting regulation 8 of the principal regulations (p3–9): joint injection at a common interconnection point, thresholds for a fresh application when location or quantum changes, what the nodal agency must specify in the connectivity order, the connection agreement and tripartite agreement, timelines and cancellation, the rule that connectivity alone does not permit interchange of power, and a detailed regime for start-up power and infirm power during commissioning, with DSM treatment of infirm power. It also bars transfer of connectivity and open access and terminates connectivity where timelines slip. Clauses 7 to 12 amend regulations 9, 10, 15, 18, 20 and insert 15A/15B on reallocating surrendered or under-utilised capacity (p9–12). Clauses 13 and 14 replace unscheduled interchange charge language with deviation charges and route accounting through the 2018 DSM Regulations (p12–14).
Read with this
The regulation
Amendments and corrections
- Dated 7 Dec 2012Grant of Connectivity, Long-term and Medium-term intra-State Open Access and Related Matters Regulations, 2010 — First Amendment, 2012
- Dated 15 Feb 2024Grant of Connectivity, Long-term and Medium-term intra-State Open Access and Related Matters Regulations, 2010 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.