HPERC · Himachal Pradesh Electricity Regulatory Commission

Grant of Connectivity, Long-Term Intra-State Open Access and Related Matters Regulations, 2010 — Second Amendment, 2021 — Draft

Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-Term Intra-State Open Access and Related Matters ) (Second Amendment) Regulations, 2021

Draft amendmentDated 6 May 2021HPERC/418 dated 6th May, 2021

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft amendment, not a made regulation. The Commission's notification of 6 May 2021 (HPERC/418) recites the Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Intra State Open Access and related Matters) Regulations, 2010 and their first amendment of 2012, and states why it is acting: to align the State regulations with the CERC's amended inter-state connectivity and open access regulations and with HPERC's Deviation Settlement Mechanism Regulations, 2018 (p1). Under s.181(3) of the Electricity Act 2003 and rule 3 of the Electricity (Procedure for Previous Publication) Rules, 2005, the draft is published for objections and will be taken up after thirty days from its Rajpatra publication (pp1-2).

The draft's ten clauses rewrite the 2010 regulations piece by piece. Clause 2 changes six definitions — dropping "bulk" from connectivity, redefining intra-State entity by reference to the 2018 DSM regulations, extending the outer limit of medium-term open access, and inserting new definitions of "project line" and "state grid" (pp2-3). Clause 3 inserts a new regulation 5A on how applications are made online, acknowledged, scrutinised, rectified and closed, with partial fee forfeiture on default (pp3-4). Clause 4 substitutes the application-fee table for connectivity and for medium- and long-term open access (p4).

Clause 5 is the largest: it permits two or more generators to inject in joint mode at a common interconnection point, sets the thresholds at which a material change forces a fresh application, describes what the nodal agency must identify when granting connectivity and what a connection agreement must contain, bans transfer or pledging of connectivity and access rights, and provides for termination on missed timelines (pp4-9). Clause 6 touches regulation 9; clause 7 adds new regulations 15A and 15B on re-using capacity freed by termination or surrender and on underutilisation of long-term access and medium-term open access (pp10-11); clause 8 extends a period in regulation 18 (p11). Clauses 9 and 10 sweep regulations 27 and 28, replacing unscheduled-interchange terminology with deviation charges and re-pointing the accounting provisions to the 2018 DSM regulations (pp11-13).

Standard name
Open Access Regulations, Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Open access charges

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document