HPERC · Himachal Pradesh Electricity Regulatory Commission
Grant of Connectivity, Long-Term Intra-State Open Access and Related Matters Regulations, 2010 — Second Amendment, 2021 — Draft
Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-Term Intra-State Open Access and Related Matters ) (Second Amendment) Regulations, 2021
Draft amendmentDated 6 May 2021HPERC/418 dated 6th May, 2021
Draft
A proposal that has since been finalised as the Grant of Connectivity and Long-term/Medium-term intra-State Open Access Regulations, 2010 — Second Amendment, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment, not a made regulation. The Commission's notification of 6 May 2021 (HPERC/418) recites the Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Intra State Open Access and related Matters) Regulations, 2010 and their first amendment of 2012, and states why it is acting: to align the State regulations with the CERC's amended inter-state connectivity and open access regulations and with HPERC's Deviation Settlement Mechanism Regulations, 2018 (p1). Under s.181(3) of the Electricity Act 2003 and rule 3 of the Electricity (Procedure for Previous Publication) Rules, 2005, the draft is published for objections and will be taken up after thirty days from its Rajpatra publication (pp1-2).
The draft's ten clauses rewrite the 2010 regulations piece by piece. Clause 2 changes six definitions — dropping "bulk" from connectivity, redefining intra-State entity by reference to the 2018 DSM regulations, extending the outer limit of medium-term open access, and inserting new definitions of "project line" and "state grid" (pp2-3). Clause 3 inserts a new regulation 5A on how applications are made online, acknowledged, scrutinised, rectified and closed, with partial fee forfeiture on default (pp3-4). Clause 4 substitutes the application-fee table for connectivity and for medium- and long-term open access (p4).
Clause 5 is the largest: it permits two or more generators to inject in joint mode at a common interconnection point, sets the thresholds at which a material change forces a fresh application, describes what the nodal agency must identify when granting connectivity and what a connection agreement must contain, bans transfer or pledging of connectivity and access rights, and provides for termination on missed timelines (pp4-9). Clause 6 touches regulation 9; clause 7 adds new regulations 15A and 15B on re-using capacity freed by termination or surrender and on underutilisation of long-term access and medium-term open access (pp10-11); clause 8 extends a period in regulation 18 (p11). Clauses 9 and 10 sweep regulations 27 and 28, replacing unscheduled-interchange terminology with deviation charges and re-pointing the accounting provisions to the 2018 DSM regulations (pp11-13).
Read with this
The regulation
Amendments and corrections
- Dated 7 Dec 2012Grant of Connectivity, Long-term and Medium-term intra-State Open Access and Related Matters Regulations, 2010 — First Amendment, 2012
- Dated 11 Aug 2021Grant of Connectivity and Long-term/Medium-term intra-State Open Access Regulations, 2010 — Second Amendment, 2021
- Dated 15 Feb 2024Grant of Connectivity, Long-term and Medium-term intra-State Open Access and Related Matters Regulations, 2010 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
Earlier drafts
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.