HPERC · Himachal Pradesh Electricity Regulatory Commission
Grant of Connectivity and Long-Term and Medium-Term Intra-State Open Access (Third Amendment) Regulations, 2023 — Draft
Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Longterm and Medium-term-Intra State Open Access and related Matters) (Third Amendment) Regulations, 2023
Draft amendmentDated 12 Dec 2023No. HPERC/418 dated the 12th December, 2023
Draft
A proposal that has since been finalised as the Grant of Connectivity, Long-term and Medium-term intra-State Open Access and Related Matters Regulations, 2010 — Third Amendment, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Himachal Pradesh Electricity Regulatory Commission proposes a third amendment to its 2010 regulations on grant of connectivity and long-term and medium-term intra-state open access (p1). The notification, No. HPERC/418 dated 12 December 2023, is a draft issued for previous publication: objections or suggestions must reach the Secretary of the Commission within thirty days of the notification's publication in the Rajpatra, Himachal Pradesh, after which the draft will be taken into consideration (p1). The stated purpose is to give impetus to smaller-capacity renewable energy projects, particularly solar PV installed in distributed mode in the State (p1).
Clause 1 names the draft regulations and provides that they come into force from the date of their publication in the Rajpatra, Himachal Pradesh — a date the notification does not print (p2).
Clause 2 substitutes the table in Regulation 6 of the 2010 Regulations, recasting application fees by band of quantum of power to be injected into or drawn from the State transmission or distribution system, with separate fee columns for connectivity, medium-term open access and long-term open access, and a distinct band reserved for small solar PV and biomass projects (p1–2).
Clause 3 substitutes the table in Regulation 7, prescribing time limits for processing connectivity applications and medium-term and long-term open access applications, counted from the last day of the month in which the application is received by the nodal agency, with a longer limit where augmentation of the transmission or distribution system is required (p2).
Read with this
The regulation
Amendments and corrections
- Dated 7 Dec 2012Grant of Connectivity, Long-term and Medium-term intra-State Open Access and Related Matters Regulations, 2010 — First Amendment, 2012
- Dated 11 Aug 2021Grant of Connectivity and Long-term/Medium-term intra-State Open Access Regulations, 2010 — Second Amendment, 2021
- Dated 15 Feb 2024Grant of Connectivity, Long-term and Medium-term intra-State Open Access and Related Matters Regulations, 2010 — Third Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.