Grant of Connectivity and Long-Term and Medium-Term Intra-State Open Access (Third Amendment) Regulations, 2023 — Draft

Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Longterm and Medium-term-Intra State Open Access and related Matters) (Third Amendment) Regulations, 2023

Draft amendmentDated 12 Dec 2023No. HPERC/418 dated the 12th December, 2023

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission proposes a third amendment to its 2010 regulations on grant of connectivity and long-term and medium-term intra-state open access (p1). The notification, No. HPERC/418 dated 12 December 2023, is a draft issued for previous publication: objections or suggestions must reach the Secretary of the Commission within thirty days of the notification's publication in the Rajpatra, Himachal Pradesh, after which the draft will be taken into consideration (p1). The stated purpose is to give impetus to smaller-capacity renewable energy projects, particularly solar PV installed in distributed mode in the State (p1).

Clause 1 names the draft regulations and provides that they come into force from the date of their publication in the Rajpatra, Himachal Pradesh — a date the notification does not print (p2).

Clause 2 substitutes the table in Regulation 6 of the 2010 Regulations, recasting application fees by band of quantum of power to be injected into or drawn from the State transmission or distribution system, with separate fee columns for connectivity, medium-term open access and long-term open access, and a distinct band reserved for small solar PV and biomass projects (p1–2).

Clause 3 substitutes the table in Regulation 7, prescribing time limits for processing connectivity applications and medium-term and long-term open access applications, counted from the last day of the month in which the application is received by the nodal agency, with a longer limit where augmentation of the transmission or distribution system is required (p2).

Standard name
Open Access Regulations, Connectivity and GNA Regulations
Primary topics
Open access, Connectivity and GNA, Fees payable to the Commission

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.