KSERC · Kerala State Electricity Regulatory Commission
Renewable Energy and Net Metering (Second Amendment) Regulations, 2024
Kerala State Electricity Regulatory Commission (Renewable Energy and Net Metering) (Second Amendment) Regulations, 2024
AmendmentDated 7 Aug 2024In force from 1 Apr 2024No. 230/Con.Engg/ 2023/ KSERC dated 7 ... th August, 2024
Replaced by Renewable Energy and Related Matters Regulations, 2025
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Renewable Energy and Net Metering Regulations, 2020.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken under the above Regulations shall be deemed to have been done or taken under the corresponding provisions of these Regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Kerala State Electricity Regulatory Commission's Second Amendment to its Renewable Energy and Net Metering Regulations, 2020, issued as Notification No. 230/Con.Engg/2023/KSERC dated 7 August 2024 but brought into force from 01.04.2024, before its own publication date (p1). Its central job is to rebuild the state's renewable purchase obligation architecture around the Ministry of Power's RPO trajectory order of 22 July 2022 and to add an energy storage obligation (p7).
Regulation 2 inserts and replaces definitions in the principal regulations — energy storage systems, energy storage obligation, hydro power obligation, wind power obligation, 'other RPO', pumped storage projects, net-billing/net feed-in (taken from the Electricity (Rights of Consumers) Rules), and revised definitions of renewable energy system and renewable source of energy (pp1-3). Regulation 3 inserts a new Table 1(a) giving the RPO trajectory year by year, split into HPO, WPO, other RPO, total RPO and ESO (p3). Regulations 4, 5 and 6 amend how distribution licensees, captive consumers and open access consumers meet the obligation, including permitted cross-adjustment between hydro, wind and other RPO surpluses and deficits (p4).
Regulations 8 and 10 clean up the principal regulations (omitting two sub-regulations, renumbering the rest) and insert a savings-style proviso that routes each financial year's obligation to the version of the regulations then in force: the 2020 regulations up to FY 2021-22, the First Amendment for FY 2022-23 and 2023-24, and these amendments from FY 2024-25 to 2029-30 (p5).
Regulation 13 adds an explanation on how solar plant capacity is counted for connectivity and on inverter certification, and Regulation 14 caps distributed energy interconnection at 90% of distribution transformer capacity and requires licensees to publish transformer-wise connected RE capacity every month; the Commission may review those provisions two years after notification (pp5-6). Regulation 33 resets the control period (p6).
The Explanatory Memorandum (pp7-8) records the drivers: the 500 GW non-fossil target, the MoP order, Kerala's climate action plan, ANERT's request to raise the transformer loading ceiling from 75% to 100% (the Commission settled on 90%), and stakeholder complaints that inverter AC output was being ignored for connectivity. The draft was published 29 January 2024 and heard on 20 March and 15 May 2024 (p8).
Read with this
The regulation
- Dated 7 Feb 2020Renewable Energy and Net Metering Regulations, 2020
Amendments and corrections
Commencement notices and reasons
Other copies of these documents (2)
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.